The first two parts of the CFATS process, the Top Screen and Security Vulnerability Assessment (SVA) are meant to prepare facilities and DHS for the Site Security Plan (SSP) and its approval. They identify what COIs exist in what quantities, possible threats and existing security measures. That allows DHS to assign a tier level (1-4). From the tier levels DHS then defines the appropriate level of security for the facility.

So that brings us to the SSP.

The first two parts of the CFATS process, the Top Screen and Security Vulnerability Assessment (SVA) are meant to prepare facilities and DHS for the Site Security Plan (SSP) and its approval. They identify what COIs exist in what quantities, possible threats and existing security measures. That allows DHS to assign a tier level (1-4). From the tier levels DHS then defines the appropriate level of security for the facility.

So that brings us to the SSP. The SSP is based on 18 Risked-Based Performance Standards (RBPS). These RBPS are meant to provide facilities with guidance on the type and level of security required by DHS, but they are not strict guidelines and they do not prescribe any specific solutions. DHS realizes that each facilities is very different and it is impossible to come up with a standardized, one-size fits all solution, so the RBPS give facilities some flexibility in the types of security measures they put in place.

While the Top Screen and SVA provide a lot of information to get started on the SSP - it's not enough. Before filling out the SSP questionnaire each facility should layout a plan. Take all of the information you have gathered and using the 18 RBPS, layout a plan and procedure to cover each standard.

For example look at the first RBPS - RBPS1 requires facilities to restrict the area perimeter. The higher the tier ranking the higher the performance expectation for nearly all of the RBPS. So, a tier 1 facility would be required to have a higher level of perimeter security than a tier 3 or 4 facility. While fencing and landscaping might be enough for one facility another may need fiber optic fencing and in ground radar.

The risk-based nature of the SSP makes planning ahead even more important. It gives the entire CFATS team at a facility the time and perspective to look at the facility and its security as a whole. For many facilities that is going to mean a much smoother SSP submittal and approval process.

Copyright © ADT Security Services, Inc. 2011 - All Rights Reserved. Legal Disclaimer - Some of the individuals posting to this site, including the moderators, work for ADT Security Services, Inc. Opinions expressed here and in any corresponding comments are the personal opinions of the original authors, not of ADT Security Services, Inc. The content is provided for informational purposes only and is not meant to be an endorsement or representation by ADT Security Services, Inc. or any other party. This site is available to the public. No information you consider confidential should be posted to this site. By posting you agree to be solely responsible for the content of all information you contribute, link to, or otherwise upload to the Website and release ADT Security Services, Inc. from any liability related to your use of the Website. You also grant to ADT Security Services, Inc. a worldwide, perpetual, irrevocable, royalty-free and fully-paid, transferable (including rights to sublicense) right to exercise all copyright, publicity, and moral rights with respect to any original content you provide. The comments are moderated. Comments will appear as soon as they are approved by the moderator.  

Sponsored Recommendations

Keys to Improving Safety in Chemical Processes (PDF)

Many facilities handle dangerous processes and products on a daily basis. Keeping everything under control demands well-trained people working with the best equipment.

Get Hands-On Training in Emerson's Interactive Plant Environment

Enhance the training experience and increase retention by training hands-on in Emerson's Interactive Plant Environment. Build skills here so you have them where and when it matters...

Rosemount™ 625IR Fixed Gas Detector (Video)

See how Rosemount™ 625IR Fixed Gas Detector helps keep workers safe with ultra-fast response times to detect hydrocarbon gases before they can create dangerous situations.

Micro Motion 4700 Coriolis Configurable Inputs and Outputs Transmitter

The Micro Motion 4700 Coriolis Transmitter offers a compact C1D1 (Zone 1) housing. Bluetooth and Smart Meter Verification are available.