1661880644481 Theplasticswasteshredded

Dow And Deep C Complete Recycled Plastic Road In Vietnam

Oct. 16, 2019
The project pilots a circular economy solution to turn post-consumer recycled plastics into new, valuable resources.

The waste is cleaned, dried and shredded before being mixed with asphalt at a temperature between 150 and 180 degrees Celsius. At this temperature, the plastic is completely melted and bonded to the asphalt.

Dow and Deep C Industrial Zones complete the first asphalt road enhanced with recycled plastics at a Deep C industrial zone in Haiphong, Vietnam. The project is a collaboration between Dow and Deep C to provide innovative solutions to address plastics waste and advance a circular economy in Vietnam.

“Dow is working to find new uses for post-consumer plastics to advance a circular economy, retain the value of plastics and keep waste out of the environment,” says Ekkasit Lakkananithiphan, general director of Dow in Vietnam. “The project value chain is an impressive display of cross-sector collaboration – it brings together local governments, infrastructure investors, asphalt suppliers, waste collectors and the material science industry to help tackle the plastic waste issue in Vietnam.”

“The launch of our first recycled plastic road marks a significant milestone in DEEP C’s journey to become the pilot eco-industrial park in Vietnam,” says Bruno Jaspaert, general director of Deep C Industrial Zones. “These durable, safe new roads not only benefit Deep C and our tenants, but also serve as a powerful message as Vietnam places plastic waste management as a top environmental priority.”

The next phase of the project will be completed by November 2019, bringing the total road length to 1.4 km. It will divert a total of 6.5 metric tons of flexible packaging from becoming litter or entering landfills – the equivalent of more than 1.7 million flexible wrappers.The post-consumer recycled plastic, mostly flexible packaging such as polyethylene film, is sourced from local waste collector Urenco Haiphong. The waste is cleaned, dried and shredded before being mixed with asphalt at a temperature between 150 and 180 degrees Celsius. At this temperature, the plastic is completely melted and bonded to the asphalt, helping to create longer lasting, more durable roads.

Before the actual pavement, two laboratory tests were conducted by Vietnam Maritime University with the outcomes satisfying Vietnamese technical and safety requirements. Upon successful execution of the project, more asphalt roads using recycled plastics will be stretched all over the Deep C Industrial Zones.

For more information, visit: www.dow.com

Sponsored Recommendations

Keys to Improving Safety in Chemical Processes (PDF)

Many facilities handle dangerous processes and products on a daily basis. Keeping everything under control demands well-trained people working with the best equipment.

Get Hands-On Training in Emerson's Interactive Plant Environment

Enhance the training experience and increase retention by training hands-on in Emerson's Interactive Plant Environment. Build skills here so you have them where and when it matters...

Rosemount™ 625IR Fixed Gas Detector (Video)

See how Rosemount™ 625IR Fixed Gas Detector helps keep workers safe with ultra-fast response times to detect hydrocarbon gases before they can create dangerous situations.

Micro Motion 4700 Coriolis Configurable Inputs and Outputs Transmitter

The Micro Motion 4700 Coriolis Transmitter offers a compact C1D1 (Zone 1) housing. Bluetooth and Smart Meter Verification are available.