Process Puzzler: Fix a Fluidized Bed

Addressing the problems may mandate multiple measures.

Share Print Related RSS
Page 1 of 2 « Prev 1 | 2 View on one page

THIS MONTH'S PUZZLER
We recently commissioned a new polypropylene plant. We had modified our earlier design to include internal cyclones in the fluidized beds to keep dust from going to the recycle compressor and cooler. However, the fluid bed reactors don't perform as expected. We're seeing: 1) fines carried over from the first to the second reactor; 2) fouling of the second recycle compressor and cooler; 3) poor distribution in the tubes at the bottom of the second fluid-bed reactor; 4) spikes of excessive heat from the second reactor; 5) plugging in the air locks carrying the product to the purge tank; and 6) temperature and pressure fluctuation in both beds that make it difficult to maintain a steady bed height. Our bed pressure taps and thermowells foul — we've tried heat tracing and purge nitrogen to reduce fouling but without success. What did we do wrong and are there any simple solutions?

START FROM SCRATCH
There are a number of potential causes for the problems witnessed. As always with troubleshooting, we're working exclusively with those problems that have been identified, not the ones missed, accepted as normal, or as yet too small to be recognized. Let's start with Dr. Ishikawa's basic fishbone diagram as a template: personnel, procedures, materials, equipment and other.

Rule out personnel at this point, except for human error in design or construction; it's too early to criticize maintenance.

With the addition of the internal cyclone, startup procedures must have changed. Inserting a cyclone reduces headspace needed for disengaging the solids, increasing pressure drop across the bed because of higher superficial velocity and making it trickier to maintain a steady bed height. Review any other changes in the design and make sure the procedures compensate for them. Look at the shutdown and steady-state operating instructions, too.

Now, consider design errors. Are there instruments to measure the pressure drops across the internal cyclone? If not, add them. Also, look for other instruments the design change should have required. Calculate the superficial velocity in each bed and compare it to the velocity without the cyclone and that used for design of the cyclone — hopefully, this wasn't overlooked during design. If the instruments for making this measurement aren't in place or have become unreliable as a result of the process, add redundant instruments or make changes in the reaction instrument package. Consider external measurements for applications where erosion or fouling are problems, and where internal measurements can't be trusted: gamma-ray scanning or even x-ray may be useful — but remember to remove instruments or they will be fried. Another idea is to develop a computation fluid dynamics (CFD) model of the process. This could be very expensive but would go a long way toward identifying the flow problems you must fix.

What about material of construction and feedstocks? The material of construction is less important because, while the ceramic catalyst potentially might damage the steel, there isn't much chance the prepolymer will. However, just because the feedstock hasn't changed doesn't mean it's right: check the catalyst and prepolymer to ensure they meet ingredient specifications.

Equipment that has changed is likely the main culprit in the process. Start with the internal cyclone. Cyclones are efficient in collecting particles around a certain diameter. According to "Perry's Chemical Engineers' Handbook," 8th ed., p. 17-36, efficiency (Eo) is inversely proportional to Dpth (the 50%-cut particle size — below that size collection drops off — not to be confused with minimum cut size): Eo ∝ [(ρp – ρg)/ μg]1/2, where p represents the particle, g represents gas at inlet conditions, and μ g is the average gas viscosity. Efficiency is proportional to the square root of the density differential over the gas viscosity. Because gas density changes little, it's nearly irrelevant. Therefore, Eo,actual/Eo, design∝ ( μ g, design/ μ g, actual)1/2. A change in gas viscosity, caused by a shift in temperature (in most cases) or pressure, alters efficiency. Gas viscosity is impossible to measure directly but perhaps could be inferred by change in density.

However, an assumption here — uniform diameter — could knock everything into a cocked hat. If particles clump together or are of an irregular size (aspect ratio > 1), even momentarily, the cyclone cut size could increase, swamping the cyclone with large particles dumping onto the fluidized bed. This could cause flow problems starting with the product discharge to the second bed. Poor velocity distribution leads to poor heat transfer.

Flow problems could create hot spots in the reactor. Catalysts would become hot from the exothermic reaction, causing localized clumping of polymer. The first place to look for fouling is in the distribution plate or tubes at the bottom of the reactors.

As for temporary solutions, consider adding cleanout plates to the air locks and lowering the bed level in the first reactor. The plates can be cut into the sides of the air locks to allow access to the rotors. I've seen air locks frozen from buildup or unable to flow beads. Lowering the bed level likely will reduce the throughput of the entire plant, so confirm instrument ranges and operating instructions for a safe turndown rate. Eventually, you'll want to determine if changing a nozzle location, in particular the discharge of the cyclone, will reduce carryover. Sometimes, it's as simple as installing a diverting plate to prevent interaction. A CFD model could be instrumental in sorting this out.

Page 1 of 2 « Prev 1 | 2 View on one page
Share Print Reprints Permissions

What are your comments?

Join the discussion today. Login Here.

Comments

  • Please give the rough sketch and what is the sequence of operation and hw exactly required the results.

    Reply

RSS feed for comments on this page | RSS feed for all comments