Perspectives: Process Puzzler

Process Puzzler: Hold Off on a Hydrogen Hike

Consider other options than increasing the feed of fresh hydrogen

*THIS MONTH’S PUZZLER* We’re planning to increase the capacity of a diesel hydrotreater unit by replacing part of the recycle hydrogen currently used with fresh hydrogen from an existing 1,200-psig system. The header begins as an 18-in., schedule-80 pipe. The control valves are each fed from a line right off the header.* Figure 1* (http://goo.gl/S801qN) shows what the header system looks like: the 1,600-ft line now handles a flow of 868 million standard cubic feet per day (MMSCFD) of hydrogen; the expansion will raise the total flow to 918 MMSCFD. One branch delivers 5 MMSCFD to isomerization. Another branch services a variety of hydrotreaters. It runs 2,500 ft and furnishes 200 MMSCFD to a hydrocracker, and then goes 3,100 ft where a common branch feeds two diesel hydrotreaters, which get 75 MMSCFD and 63 MMSCFD, respectively, and an ultra-low-sulfur diesel (ULSD) hydrotreater, which is fed 75 MMSCFD. After the diesel header, the line decreases in size to 12 in. and goes 2,700 ft to a kerosene hydrotreater fed 85 MMSCFD. It then continues 2,600 ft to a naphtha hydrotreater that gets 75 MMSCFD and to another header that delivers 140 MMSCFD to a gasoline hydrotreater and 150 MMSCFD to a fluid catalytic cracker (FCC) hydrotreater. The expansion will increase the hydrogen flow to the diesel hydrotreater 2 to 113 MMSCFD from 63; the % open for the control valve only will increase to 76% from 61%, so the project has been approved. The flows are all nominal-high values. A production engineer now is questioning the idea of increasing the fresh H2 output; he’s afraid it will put a strain on the system. What do you think?   *LOOK AT THE BIG PICTURE* Anytime you increase the system demand by 50 MMSCFD, i.e., 6%, with a pressure control valve (PCV) already at 72%, there will be trouble. Obviously, the compressor supplying the H2 and the control valve are sized together. With higher flow, head will decrease eventually. The rise to 79% open for the PCV probably is caused by a drop in the compressor head.

Read more

More from this perspective...

Title

Get Relief From Valve Popping

Readers suggest ways to address thermal expansion issue.

10/14/2014

Forestall Fermenter Fouling

Readers suggest how to properly clean unit to eliminate scourge of wild yeast .

05/20/2013

Foil Future Fires

Readers point to possible causes of a blaze.

04/05/2011

Foil Coil Destruction

A number of steps may pre-empt problems

12/13/2011

Fight a Film Fiasco

Readers suggest how to address heat exchanger fouling and inappropriate cleaning.

02/13/2012

February's Process Puzzler: Improve a grandfathered unloading station

Readers suggest ways to improve a grandfathered unloading station in this month's Process Puzzler.

01/30/2007

February Process Puzzler: Isolate Electrical Incidents

Readers unravel a wiring riddle.

02/03/2009

Ensure a Satisfactory Steam System

Readers suggest ways to improve steam operations

08/13/2014

Don’t waste your boilers

Chemical Processing's readers offer tips about how to properly isolate a waste heat boiler.

01/02/2006

Don't Scoff At the Expert

Readers recommend significant upgrades to a relief system.

03/21/2012

Don't Impair Level Measurements

Several factors can prevent two sensors from giving matching readings.

09/21/2010

Don't Be Stumped by a Sump

Several steps can help handle gasoline-laden vent gas.

01/12/2012

December Process Puzzler: Debug a weigh feeder

Readers offer ideas for improving reliability of a weigh feeder in Chemical Processing's monthly Process Puzzler feature.

11/29/2006

Cure column hiccups

12/29/2005

Cope With Condenser Constraints

Readers suggest ways to maintain performance on hot days.

12/10/2012

Condensate cripples compressor

Readers offer tips on how to keep a standby compressor ready for service.

01/05/2006

Clear Up a Compressor Conundrum

Readers decipher a compressor surge.

03/23/2009

Choose Cleaning Solvent Wisely

Readers raise a variety of issues to consider.

03/17/2011

Chillers Require Cold-Eyed Review

Readers suggest ways to avoid temperatures swings and trips.

11/09/2011

Burst a Bubble

Readers suggest how to preclude ignition-temperature-test failures.

05/08/2012