Process Puzzler: Hold Off on a Hydrogen Hike

Consider other options than increasing the feed of fresh hydrogen

*THIS MONTH’S PUZZLER* We’re planning to increase the capacity of a diesel hydrotreater unit by replacing part of the recycle hydrogen currently used with fresh hydrogen from an existing 1,200-psig system. The header begins as an 18-in., schedule-80 pipe. The control valves are each fed from a line right off the header.* Figure 1* (http://goo.gl/S801qN) shows what the header system looks like: the 1,600-ft line now handles a flow of 868 million standard cubic feet per day (MMSCFD) of hydrogen; the expansion will raise the total flow to 918 MMSCFD. One branch delivers 5 MMSCFD to isomerization. Another branch services a variety of hydrotreaters. It runs 2,500 ft and furnishes 200 MMSCFD to a hydrocracker, and then goes 3,100 ft where a common branch feeds two diesel hydrotreaters, which get 75 MMSCFD and 63 MMSCFD, respectively, and an ultra-low-sulfur diesel (ULSD) hydrotreater, which is fed 75 MMSCFD. After the diesel header, the line decreases in size to 12 in. and goes 2,700 ft to a kerosene hydrotreater fed 85 MMSCFD. It then continues 2,600 ft to a naphtha hydrotreater that gets 75 MMSCFD and to another header that delivers 140 MMSCFD to a gasoline hydrotreater and 150 MMSCFD to a fluid catalytic cracker (FCC) hydrotreater. The expansion will increase the hydrogen flow to the diesel hydrotreater 2 to 113 MMSCFD from 63; the % open for the control valve only will increase to 76% from 61%, so the project has been approved. The flows are all nominal-high values. A production engineer now is questioning the idea of increasing the fresh H2 output; he’s afraid it will put a strain on the system. What do you think?   *LOOK AT THE BIG PICTURE* Anytime you increase the system demand by 50 MMSCFD, i.e., 6%, with a pressure control valve (PCV) already at 72%, there will be trouble. Obviously, the compressor supplying the H2 and the control valve are sized together. With higher flow, head will decrease eventually. The rise to 79% open for the PCV probably is caused by a drop in the compressor head.

Read more

More from this perspective...

Title

Vanquish Vacuum Pump Vexations

Readers suggest how to pinpoint problems

06/11/2012

Tap the Best Tie-in

Readers consider where to get compressed air for a pump.

07/25/2012

Make The Right Opening Move

Readers suggest how to relate valve position to flow.

08/15/2012

Process Puzzler: Tame Tower Temperature Turmoil

Start-up conditions may provide key insights about what's causing problems.

09/20/2012

Worker Death: Place Blame Where It Really Belongs

Readers suggest the actual culprits behind a welder's death.

10/24/2012

Process Puzzler: Replace the Tank

A fiberglass vessel isn't appropriate for the intended use.

11/20/2012

Cope With Condenser Constraints

Readers suggest ways to maintain performance on hot days.

12/10/2012

Get Rid Of Problems Not Just Off-Gas

A variety of factors may compromise performance of an oxidizer.

01/15/2013

Process Puzzler: Preempt Pump Problems

Readers suggest several options to improve reliability

02/01/2013

Pumping LPG: Take A Load Off Loading

Readers suggest how to avoid problems in pumping liquefied petroleum gas.

02/28/2013

Beat Dryer Difficulties

Readers suggest ways to get a second-hand unit to perform better

03/28/2013

Forestall Fermenter Fouling

Readers suggest how to properly clean unit to eliminate scourge of wild yeast .

05/20/2013

Process Puzzler: Restore Reboiler Reliability

Readers recommend ways to keep a thermosiphon operating properly

05/30/2013

Process Puzzler: Go With Agglomeration

Safely reprocessing flammable polymer dust demands a number of measures.

06/27/2013

Process Puzzler: Veto the Proposed Vent Scrubber

Its design suffers from serious mechanical and safety deficiencies.

07/31/2013

Slop Oil System Is Too Sloppy

Addressing safety and environmental issues will demand major modifications

08/28/2013

Process Puzzler: Sort Out a Steam Condensate System

Readers suggest ways to address water hammer and other problems.

10/07/2013

Options May Improve Aniline Removal From Wastewater

Readers offer suggestions for a two-stage countercurrent solvent extraction process.

11/12/2013

A Troubled Process for Producing Surfactant Requires Considerable Change

Readers help sort out a sulfonation in shambles.

12/05/2013

Kayo Another Compressor Catastrophe

Reciprocating unit requires multiple revisions.

01/20/2014