Perspectives: Process Puzzler

Process Puzzler: Hold Off on a Hydrogen Hike

Consider other options than increasing the feed of fresh hydrogen

*THIS MONTH’S PUZZLER* We’re planning to increase the capacity of a diesel hydrotreater unit by replacing part of the recycle hydrogen currently used with fresh hydrogen from an existing 1,200-psig system. The header begins as an 18-in., schedule-80 pipe. The control valves are each fed from a line right off the header.* Figure 1* (http://goo.gl/S801qN) shows what the header system looks like: the 1,600-ft line now handles a flow of 868 million standard cubic feet per day (MMSCFD) of hydrogen; the expansion will raise the total flow to 918 MMSCFD. One branch delivers 5 MMSCFD to isomerization. Another branch services a variety of hydrotreaters. It runs 2,500 ft and furnishes 200 MMSCFD to a hydrocracker, and then goes 3,100 ft where a common branch feeds two diesel hydrotreaters, which get 75 MMSCFD and 63 MMSCFD, respectively, and an ultra-low-sulfur diesel (ULSD) hydrotreater, which is fed 75 MMSCFD. After the diesel header, the line decreases in size to 12 in. and goes 2,700 ft to a kerosene hydrotreater fed 85 MMSCFD. It then continues 2,600 ft to a naphtha hydrotreater that gets 75 MMSCFD and to another header that delivers 140 MMSCFD to a gasoline hydrotreater and 150 MMSCFD to a fluid catalytic cracker (FCC) hydrotreater. The expansion will increase the hydrogen flow to the diesel hydrotreater 2 to 113 MMSCFD from 63; the % open for the control valve only will increase to 76% from 61%, so the project has been approved. The flows are all nominal-high values. A production engineer now is questioning the idea of increasing the fresh H2 output; he’s afraid it will put a strain on the system. What do you think?   *LOOK AT THE BIG PICTURE* Anytime you increase the system demand by 50 MMSCFD, i.e., 6%, with a pressure control valve (PCV) already at 72%, there will be trouble. Obviously, the compressor supplying the H2 and the control valve are sized together. With higher flow, head will decrease eventually. The rise to 79% open for the PCV probably is caused by a drop in the compressor head.

Read more

More from this perspective...

Title

Process Manufacturing Puzzler: Stop solvent losses

A reader is sufferring significant solvent losses during his batch process. Read about how his peers might solve his problem.

04/01/2005

Process Puzzler Question: Lengthen media life and reduce operating costs in a pressure filter

Our pressure filter suffers from excessive cake build-up. Although some caking is necessary for efficient filtering, it would be desirable to extend the running time. What do you suggest? Also, do you have any ideas on how we can lengthen media life or reduce operating costs?

06/16/2008

Process Puzzler: Avoid Another Fatal Accident

Readers consider the causes of a deadly fire.

06/19/2009

Process Puzzler: Choose a pump wisely

Readers offer tips about how to choose the best pump for slurry service.

05/25/2005

Process Puzzler: Combat Column Contamination

Readers suggest how to tackle a troublesome tower.

12/15/2009

Process Puzzler: Confront Column Constraints

Upgrading an atmospheric tower may require operational and design changes.

05/20/2014

Process Puzzler: Deal with a Decanter that Can't

Readers recommend ways to save a standing separator.

10/14/2010

Process Puzzler: Deal with dryer drizzle

Readers suggest ways to solve a spray interference problem

06/16/2008

Process Puzzler: Eliminate Evaporator Effect

Readers solve an evaporation pump problem.

05/21/2009

Process Puzzler: Fix a Fluid Flow Flaw

Readers suggest solutions for dryer difficulties.

09/15/2009

Process Puzzler: Fix a Fluidized Bed

Addressing the problems may mandate multiple measures.

04/02/2014

Process Puzzler: Go With Agglomeration

Safely reprocessing flammable polymer dust demands a number of measures.

06/27/2013

Process Puzzler: Guard Against Gas

Readers suggest the source of a safety stumper.

11/10/2009

Process Puzzler: Kayo a Cascade Control Complication

Readers suggest how to properly regulate an exothermic reaction.

04/24/2009

Process Puzzler: Keep Incineration Safe

Readers suggest how to deal with a cyanide-containing fuel.

01/25/2010

Process Puzzler: Keep cables in their place

A Chemical Processing reader was looking for a solution to a cable hanger problem. At his plant, a 200-lb. cable bundle supported by cable hangers fell and injured one man. Read what advice our readers had for him and take a look at next months' question.

02/21/2005

Process Puzzler: Look Beyond The Valve

Other factors can contribute to persistent valve leaks.

01/14/2011

Process Puzzler: Make Solid Progress

Readers suggest ways to improve crystallizer controls.

06/16/2010

Process Puzzler: Master a Musty Mess

Readers suggest how to deal with a contamination source.

08/13/2009

Process Puzzler: Preempt Pump Problems

Readers suggest several options to improve reliability

02/01/2013