Perspectives: Process Puzzler

Get Relief From Valve Popping

Readers suggest ways to address thermal expansion issue.

*THIS MONTH’S PUZZLER* We’re suffering an annoying thermal expansion problem in the ethylene oxide (EO) lines that feed our reactors: pressure relief valves (PRVs) often pop from solar heating, because lines are blocked in, typically for up to ten minutes. (Our design standard assumes horizontal pipe and a maximum ambient temperature of 95°F, which doesn’t occur very often at our Chicago site: solar flux is 38.7 Btu/h-ft2 for the summer solstice.) The PRVs wouldn’t be such a problem but EO can polymerize and cause them to stick open, which is why the covered area under the reactors is Class 1, Division 1, Group B. The EO feed pipe runs at 55 psig at 60°F. The PRVs are set at 145 psig. Barometric pressure is 14.408 psia. The properties of EO at operating conditions are: density, 66.8 lb/ft3; viscosity, 0.302 cP; heat capacity, 0.476 BTU/lb-F; thermal conductivity, 0.0949 BTU/h-ft2-°R; volumetric thermal expansion coefficient, 0.001°F-1; and bulk modulus, 180,000 psi/ft3. Our plant engineer is convinced that two inches of calcium silicate insulation in a stainless steel jacket over our 1½-in. Schedule-80 Type-316 stainless-steel pipe largely will eliminate our PRV reliability problem. What do you think?

Read more

More from this perspective...

Title

Heat Exchanger Puzzler: Make the Best of a Blunder

Readers suggest ways to get an incorrect exchanger to do the job.

05/04/2011

Foil Future Fires

Readers point to possible causes of a blaze.

04/05/2011

Choose Cleaning Solvent Wisely

Readers raise a variety of issues to consider.

03/17/2011

Process Puzzler: Look Beyond The Valve

Other factors can contribute to persistent valve leaks.

01/14/2011

Vanquish Vexing Venting

Try process-control and equipment changes to eliminate hydrogen losses.

12/13/2010

Process Puzzler: Root Out Rumbling

Measurements can confirm the cause of the problem in the fiber-glass piping.

11/11/2010

Process Puzzler: Deal with a Decanter that Can't

Readers recommend ways to save a standing separator.

10/14/2010

Don't Impair Level Measurements

Several factors can prevent two sensors from giving matching readings.

09/21/2010

Keep Catalyst From Overheating

Readers react to a fouling problem in an exchanger.

08/25/2010

Successfully Satisfy Catalyst Requirements

Readers recommend ways to remove excess oxygen and water.

07/14/2010

Process Puzzler: Make Solid Progress

Readers suggest ways to improve crystallizer controls.

06/16/2010

Is an Expansion Joint Good For the Long Stretch?

Contributors suggest how to handle thermal and water issues.

05/19/2010

Process Puzzler: Put Railcar Loading Back on Track

Readers suggest how to stop serious safety snags.

04/21/2010

Add Other Options to the Mix

Readers suggest how to improve a blending operation.

03/16/2010

Take the Pressure Off Loading

Readers suggest how to avoid risks during upsets.

02/16/2010

Process Puzzler: Keep Incineration Safe

Readers suggest how to deal with a cyanide-containing fuel.

01/25/2010

Process Puzzler: Combat Column Contamination

Readers suggest how to tackle a troublesome tower.

12/15/2009

Process Puzzler: Guard Against Gas

Readers suggest the source of a safety stumper.

11/10/2009

Process Puzzler: Tell the Bosses the Truth

Management’s goal for a material balance likely isn’t feasible.

10/15/2009

Process Puzzler: Fix a Fluid Flow Flaw

Readers suggest solutions for dryer difficulties.

09/15/2009