Perspectives: Process Puzzler

Get Relief From Valve Popping

Readers suggest ways to address thermal expansion issue.

*THIS MONTH’S PUZZLER* We’re suffering an annoying thermal expansion problem in the ethylene oxide (EO) lines that feed our reactors: pressure relief valves (PRVs) often pop from solar heating, because lines are blocked in, typically for up to ten minutes. (Our design standard assumes horizontal pipe and a maximum ambient temperature of 95°F, which doesn’t occur very often at our Chicago site: solar flux is 38.7 Btu/h-ft2 for the summer solstice.) The PRVs wouldn’t be such a problem but EO can polymerize and cause them to stick open, which is why the covered area under the reactors is Class 1, Division 1, Group B. The EO feed pipe runs at 55 psig at 60°F. The PRVs are set at 145 psig. Barometric pressure is 14.408 psia. The properties of EO at operating conditions are: density, 66.8 lb/ft3; viscosity, 0.302 cP; heat capacity, 0.476 BTU/lb-F; thermal conductivity, 0.0949 BTU/h-ft2-°R; volumetric thermal expansion coefficient, 0.001°F-1; and bulk modulus, 180,000 psi/ft3. Our plant engineer is convinced that two inches of calcium silicate insulation in a stainless steel jacket over our 1½-in. Schedule-80 Type-316 stainless-steel pipe largely will eliminate our PRV reliability problem. What do you think?

Read more

More from this perspective...

Title

Process Puzzler: Spike Tank Spikes

Readers suggest how to avoid column feed tank problems.

05/31/2011

Process Puzzler: Sort Out a Steam Condensate System

Readers suggest ways to address water hammer and other problems.

10/07/2013

Process Puzzler: Soothe a Skittish Supervisor

Readers weigh the wisdom of cladding exchanger tubes to answer last month's Process Puzzler.

12/16/2008

Process Puzzler: Sidestep a Scale-up Scare

Readers grapple with a reactor production change.

03/04/2009

Process Puzzler: Serve up better column operation

Readers tackle Chemical Processing's process puzzler question and offer tips about how to keep a stripper column from flooding.

12/21/2004

Process Puzzler: Root Out Rumbling

Measurements can confirm the cause of the problem in the fiber-glass piping.

11/11/2010

Process Puzzler: Restore Reboiler Reliability

Readers recommend ways to keep a thermosiphon operating properly

05/30/2013

Process Puzzler: Replace the Tank

A fiberglass vessel isn't appropriate for the intended use.

11/20/2012

Process Puzzler: Put Railcar Loading Back on Track

Readers suggest how to stop serious safety snags.

04/21/2010

Process Puzzler: Preempt Pump Problems

Readers suggest several options to improve reliability

02/01/2013

Process Puzzler: Master a Musty Mess

Readers suggest how to deal with a contamination source.

08/13/2009

Process Puzzler: Make Solid Progress

Readers suggest ways to improve crystallizer controls.

06/16/2010

Process Puzzler: Look Beyond The Valve

Other factors can contribute to persistent valve leaks.

01/14/2011

Process Puzzler: Keep cables in their place

A Chemical Processing reader was looking for a solution to a cable hanger problem. At his plant, a 200-lb. cable bundle supported by cable hangers fell and injured one man. Read what advice our readers had for him and take a look at next months' question.

02/21/2005

Process Puzzler: Keep Incineration Safe

Readers suggest how to deal with a cyanide-containing fuel.

01/25/2010

Process Puzzler: Kayo a Cascade Control Complication

Readers suggest how to properly regulate an exothermic reaction.

04/24/2009

Process Puzzler: Guard Against Gas

Readers suggest the source of a safety stumper.

11/10/2009

Process Puzzler: Go With Agglomeration

Safely reprocessing flammable polymer dust demands a number of measures.

06/27/2013

Process Puzzler: Fix a Fluidized Bed

Addressing the problems may mandate multiple measures.

04/02/2014

Process Puzzler: Fix a Fluid Flow Flaw

Readers suggest solutions for dryer difficulties.

09/15/2009