Perspectives: Process Puzzler

Forestall Fermenter Fouling

Readers suggest how to properly clean unit to eliminate scourge of wild yeast .


THIS MONTH'S PUZZLER
We're suffering wild yeast problems in our ethanol fermenters. Our clean-in-place system had run flawlessly for 15 years with little attention. The cycle is a rinse with steam/water at 160°F, followed by a weak caustic wash at 210°F, a hot water rinse, a rinse with an organic iodine solution with phosphoric acid, and finally another rinse with hot water. A few months back during the winter we increased the number of times we reused the caustic from three to six before sending the stream to waste treatment. Now, it's spring and we're seeing wild yeast in our cream tanks. We went back to using the caustic three times and then to just once — but that only modestly affected the wild yeast we're seeing in the product. Is the change in the number of times the caustic is used to blame? Or is it something else? How can we solve this problem?


CHANGE BIOCIDE
You're not doing an effective biocidal treatment to rid the system of the wild yeast. The steam and hot water treatments should be supplemented with a broader spectrum biocide than the organic iodine. A peracetic acid/hydrogen peroxide biocide has been used successfully in bioethanol plants for several years.
Jon Howarth, senior vice president technology
Enviro Tech Chemical Services, Modesto, Calif.

CHECK FOR CORROSION
Not being familiar with wild yeast or tame yeast, I have only a small suggestion based on your description of the cleaning process. Could reducing caustic strength have resulted in an increase in effective acid strength of your organic iodine/phosphoric acid rinse? Could you have corroded some sections of your process that developed microbiological growth tubercules that you're now unable to remove with normal procedures? An internal inspection of your equipment or aggressive cleaning may be required to restore the balance.
 Pete Bisila, system reliability engineer - utilities
 Pine Bend Refinery, Flint Hills Resources, Inver Grove Heights, Minn.

DISASSEMBLY IS REQUIRED
Once wild yeast gets into your plant you're doomed to tearing it apart to clean it. When I worked at the Anheuser-Busch (AB), a new plant manager wanted to impress management by reducing costs. He cut the caustic back and infected the entire plant with wild yeast. He was invited to lunch and never came back, which became a joke — don't go out to lunch with a vice president. The problem was solved by replacing a lot of defective spray balls, flushing the entire system with caustic and, after a rinse, a chaser of saturated steam for good measure. After several weeks, the fermenters were able to make clean product. We learned a hard lesson: don't ignore a system just because it's never a problem. Sadly, this is a lesson I've seen plants learn over and over again.

The first thing to do is to inspect the clean-in-place (CIP) system and then the circuit it takes: 1) make sure all surfaces aren't corroded and tanks are smooth to a minimum finish of 1.32 micron roughness average (Ra), which corresponds roughly to 120 grit, and welds are smooth to 6.32 micron Ra, i.e., about 60 grit —this meets standards for dairies and breweries but pharmaceutical operations require electropolishing to Ra < 0.6 micron, corresponding to a 220 grit; 2) check drainage for all lines and equipment — there's nothing worse than standing water for bacteria, insects and corrosion; 3) confirm flows and heads to all spray balls used to clean tank surfaces; 4) replace corroded equipment in the CIP system — this can act as an appendix, storing bugs for future colonization of your plant; 5) test the surface temperatures during cleaning — a cold spot also can keep bugs safe; initially, during the decontamination phase, you'll want to steam out equipment directly as it's disassembled for inspection; 6) check the gaskets — non-food-grade gaskets can creep into inventories, sometimes with incorrect serial numbers; 7) watch the spray balls to ensure they're working and not leaking; 8) inspect the fermenter chimneys for areas allowing poor heating, dripping back into the fermenter and corrosion; 9) don't forget ancillary equipment — at AB we found wild yeast collecting in the air blower supplying our fermenters: once it was because the high efficiency particulate air (HEPA) filters collapsed on a foggy day; another time the HEPA filter was accidentally removed; and yet another time, air leaked around the filter; and 10) inspect spargers and other equipment that may not have the correct finish or have sharp angles where bugs can hide — spargers were a big red flag at AB.

Lastly, you may want to include saturated steam in the cleaning process. This must be done cautiously because nitrile rubber gaskets (the most common kind) won't stand high temperature steam without cracking and becoming a crevice for bugs. Another reason is thermal expansion, which can cause problems with agitators, thin-walled tanks and even pumps.

The killing capability of steam is a function of time (heat-up, dwell time, cool-down), mixing created by high flow rate, and temperature. Time and temperature are inversely related. The killing power generally is compared to its value at 121.1°C (Fo = 1 at 121.1°C) and ratioed according to the equation: Fo = 10(T – 121.1)/10, where T is a temperature other than 121.1. So, if we assume 265°F (129°C) for a dwell temperature, achieved by sparging steam into a fluid stream, Fo will be more than six times greater and only about one-sixth the time needed at 121.1°C will be required, or about 10. To reduce product damage, such as caramelization, when steaming out at high temperature, provide fast quenching to limit exposure time.

For a worst case, with a colony of wild yeast, I recommend steaming equipment at as high a temperature as possible, at the equivalent of 30 minutes at 121.1°C. At no time should you try sterilization below 180°F (82°C). Use an infrared gun to confirm the temperature using a black spot as a transmitting surface. Air or a hot gas can substitute for steam with a reduction in heat transfer: 1,000 Btu/hr-ft2-°F for saturated steam but only 1 Btu/hr-ft2-°F for air.

If you're interested in more information on metal surfaces and standards, check out this webpage: www.ljstar.com/design/surface_charts.aspx. For information on sterilization practices refer to: www.gmpua.com/World/GreatBritain/HTM/HTM2010Part5.pdf and www.ch2m-idcfs.com/Papers/IDC2002%20autoclave.pdf.
Dirk Willard, contract senior process engineer
Superior Engineers, Hammond, Ind.

JULY'S PUZZLER
Our polyphenylene ether (PPE) process generates a lot of dust and PPE resin is a severe fire hazard. I'm tasked with figuring out a way to collect and reprocess this dust. I'm considering agglomeration. Do you think this is a good option? If so, what do I need to do? If not, what would you suggest?

Send us your comments, suggestions or solutions for this question by June 14, 2013. We'll include as many of them as possible in the July 2013 issue and all on ChemicalProcessing.com. Send visuals — a sketch is fine. E-mail us at ProcessPuzzler@putman.net or mail to Process Puzzler, Chemical Processing, 555 W. Pierce Road, Suite 301, Itasca, IL 60143. Fax: (630) 467-1120. Please include your name, title, location and company affiliation in the response.

And, of course, if you have a process problem you'd like to pose to our readers, send it along and we'll be pleased to consider it for publication.


More from this perspective...

Title

January Process Puzzler: Sticky valve

Readers offer ideas for the cause of a sticky valve in Chemical Processing's monthly Process Puzzler feature.

01/03/2007

February's Process Puzzler: Improve a grandfathered unloading station

Readers suggest ways to improve a grandfathered unloading station in this month's Process Puzzler.

01/30/2007

March Process Puzzler: Does removal approach offer a quicksilver lining?

Readers consider ways to clean mercury from scrubber blowdown in this month's Process Puzzler.

03/01/2007

April Process Puzzler: What do we tell maintenance?

Readers identify problems with a relief system in April's Process Puzzler.

03/29/2007

May Process Puzzler: Quick fix needed!

Readers recommend solutions for a pump control problem in this month's Chemical Processing Process Puzzler.

04/24/2007

June Process Puzzler: Forestall furnace foibles

Readers suggest how to address a hard-running vaporizer in this month's Process Puzzler.

05/16/2007

July Process Puzzler: Blow away conveying system problems

Readers suggest how to improve the reliability of a crucial blower in this month's Process Puzzler.

07/06/2007

August Process Puzzler: Remove operating problems not just an impurity

Readers suggest how to keep sludge from clogging equipment in this month's Process Puzzler.

08/01/2007

September Process Puzzler: Will steam get a plant into hot water?

Readers offer advice about switching a clean-in-place procedure.

08/31/2007

October Process Puzzler: Keep a float from sinking operation

Readers suggest how to achieve reliable level measurement, in this month's Process Puzzler.

09/27/2007

November Process Puzzler: Deter dryer difficulties

Readers suggest how to improve reliability and avoid danger, in this month's Process Puzzler.

10/30/2007

August 2008: Designing a desulfurization process

How would you improve this design?

06/01/2008

Process Puzzler: Deal with dryer drizzle

Readers suggest ways to solve a spray interference problem

06/16/2008

Process Puzzler Question: Lengthen media life and reduce operating costs in a pressure filter

Our pressure filter suffers from excessive cake build-up. Although some caking is necessary for efficient filtering, it would be desirable to extend the running time. What do you suggest? Also, do you have any ideas on how we can lengthen media life or reduce operating costs?

06/16/2008

September 2008 Process Puzzler: Kayo a Drum Problem

Readers suggest ways to improve the performance of a pot

08/13/2008

September Process Puzzler: Fix a Fast Fouling Filter

Readers suggest ways to improve operation and safety. Also included is November's Process Puzzler Question.

09/05/2008

Quell a Quality Control Confrontation

Readers recommend improvements for a pH control process

10/27/2008

Get out of the Soup

Readers clarify a consistency complication.

12/02/2008

Process Puzzler: Soothe a Skittish Supervisor

Readers weigh the wisdom of cladding exchanger tubes to answer last month's Process Puzzler.

12/16/2008

February Process Puzzler: Isolate Electrical Incidents

Readers unravel a wiring riddle.

02/03/2009