Perspectives: Process Puzzler

Get Relief From Valve Popping

Readers suggest ways to address thermal expansion issue.

*THIS MONTH’S PUZZLER* We’re suffering an annoying thermal expansion problem in the ethylene oxide (EO) lines that feed our reactors: pressure relief valves (PRVs) often pop from solar heating, because lines are blocked in, typically for up to ten minutes. (Our design standard assumes horizontal pipe and a maximum ambient temperature of 95°F, which doesn’t occur very often at our Chicago site: solar flux is 38.7 Btu/h-ft2 for the summer solstice.) The PRVs wouldn’t be such a problem but EO can polymerize and cause them to stick open, which is why the covered area under the reactors is Class 1, Division 1, Group B. The EO feed pipe runs at 55 psig at 60°F. The PRVs are set at 145 psig. Barometric pressure is 14.408 psia. The properties of EO at operating conditions are: density, 66.8 lb/ft3; viscosity, 0.302 cP; heat capacity, 0.476 BTU/lb-F; thermal conductivity, 0.0949 BTU/h-ft2-°R; volumetric thermal expansion coefficient, 0.001°F-1; and bulk modulus, 180,000 psi/ft3. Our plant engineer is convinced that two inches of calcium silicate insulation in a stainless steel jacket over our 1½-in. Schedule-80 Type-316 stainless-steel pipe largely will eliminate our PRV reliability problem. What do you think?

Read more

More from this perspective...

Title

February's Process Puzzler: Improve a grandfathered unloading station

Readers suggest ways to improve a grandfathered unloading station in this month's Process Puzzler.

01/30/2007

March Process Puzzler: Does removal approach offer a quicksilver lining?

Readers consider ways to clean mercury from scrubber blowdown in this month's Process Puzzler.

03/01/2007

April Process Puzzler: What do we tell maintenance?

Readers identify problems with a relief system in April's Process Puzzler.

03/29/2007

May Process Puzzler: Quick fix needed!

Readers recommend solutions for a pump control problem in this month's Chemical Processing Process Puzzler.

04/24/2007

June Process Puzzler: Forestall furnace foibles

Readers suggest how to address a hard-running vaporizer in this month's Process Puzzler.

05/16/2007

July Process Puzzler: Blow away conveying system problems

Readers suggest how to improve the reliability of a crucial blower in this month's Process Puzzler.

07/06/2007

August Process Puzzler: Remove operating problems not just an impurity

Readers suggest how to keep sludge from clogging equipment in this month's Process Puzzler.

08/01/2007

September Process Puzzler: Will steam get a plant into hot water?

Readers offer advice about switching a clean-in-place procedure.

08/31/2007

October Process Puzzler: Keep a float from sinking operation

Readers suggest how to achieve reliable level measurement, in this month's Process Puzzler.

09/27/2007

November Process Puzzler: Deter dryer difficulties

Readers suggest how to improve reliability and avoid danger, in this month's Process Puzzler.

10/30/2007

August 2008: Designing a desulfurization process

How would you improve this design?

06/01/2008

Process Puzzler: Deal with dryer drizzle

Readers suggest ways to solve a spray interference problem

06/16/2008

Process Puzzler Question: Lengthen media life and reduce operating costs in a pressure filter

Our pressure filter suffers from excessive cake build-up. Although some caking is necessary for efficient filtering, it would be desirable to extend the running time. What do you suggest? Also, do you have any ideas on how we can lengthen media life or reduce operating costs?

06/16/2008

October's Puzzler: Change Layout and Operating Procedures to Reduce Risk

08/13/2008

September 2008 Process Puzzler: Kayo a Drum Problem

Readers suggest ways to improve the performance of a pot

08/13/2008

September Process Puzzler: Fix a Fast Fouling Filter

Readers suggest ways to improve operation and safety. Also included is November's Process Puzzler Question.

09/05/2008

October Process Puzzler: Foil a Future Fire

Readers suggest ways to improve safety at a cylinder storage site. Also, December's Process Puzzler: Improving coagulant consistency.

10/13/2008

Quell a Quality Control Confrontation

Readers recommend improvements for a pH control process

10/27/2008

Get out of the Soup

Readers clarify a consistency complication.

12/02/2008

Process Puzzler: Soothe a Skittish Supervisor

Readers weigh the wisdom of cladding exchanger tubes to answer last month's Process Puzzler.

12/16/2008