Perspectives: Process Puzzler

Get Relief From Valve Popping

Readers suggest ways to address thermal expansion issue.

*THIS MONTH’S PUZZLER* We’re suffering an annoying thermal expansion problem in the ethylene oxide (EO) lines that feed our reactors: pressure relief valves (PRVs) often pop from solar heating, because lines are blocked in, typically for up to ten minutes. (Our design standard assumes horizontal pipe and a maximum ambient temperature of 95°F, which doesn’t occur very often at our Chicago site: solar flux is 38.7 Btu/h-ft2 for the summer solstice.) The PRVs wouldn’t be such a problem but EO can polymerize and cause them to stick open, which is why the covered area under the reactors is Class 1, Division 1, Group B. The EO feed pipe runs at 55 psig at 60°F. The PRVs are set at 145 psig. Barometric pressure is 14.408 psia. The properties of EO at operating conditions are: density, 66.8 lb/ft3; viscosity, 0.302 cP; heat capacity, 0.476 BTU/lb-F; thermal conductivity, 0.0949 BTU/h-ft2-°R; volumetric thermal expansion coefficient, 0.001°F-1; and bulk modulus, 180,000 psi/ft3. Our plant engineer is convinced that two inches of calcium silicate insulation in a stainless steel jacket over our 1½-in. Schedule-80 Type-316 stainless-steel pipe largely will eliminate our PRV reliability problem. What do you think?

Read more

More from this perspective...

Title

Worker Death: Place Blame Where It Really Belongs

Readers suggest the actual culprits behind a welder's death.

10/24/2012

Vanquish Vexing Venting

Try process-control and equipment changes to eliminate hydrogen losses.

12/13/2010

Vanquish Vacuum Pump Vexations

Readers suggest how to pinpoint problems

06/11/2012

Vanquish Vacuum Distillation Difficulties

Readers recommend a variety of improvements.

03/12/2014

Track that spill

Chemical Processing's readers offer tips about how to locate and identify a chemical spill.

01/02/2006

Tap the Best Tie-in

Readers consider where to get compressed air for a pump.

07/25/2012

Tame a Troublesome Thermowell

Readers suggest solutions for a fluid-bed corrosion issue.

07/23/2009

Take the Pressure Off Loading

Readers suggest how to avoid risks during upsets.

02/16/2010

Successfully Satisfy Catalyst Requirements

Readers recommend ways to remove excess oxygen and water.

07/14/2010

Slop Oil System Is Too Sloppy

Addressing safety and environmental issues will demand major modifications

08/28/2013

Silo Holds Mysteries

Readers ponder why an old tank failed.

08/23/2011

September Process Puzzler: Will steam get a plant into hot water?

Readers offer advice about switching a clean-in-place procedure.

08/31/2007

September Process Puzzler: Uncovering cause of solid build-up

Readers offer suggestions to improve reliability of a vibrating screen in Chemical Processing's monthly Process Puzzler feature.

09/14/2006

September Process Puzzler: Fix a Fast Fouling Filter

Readers suggest ways to improve operation and safety. Also included is November's Process Puzzler Question.

09/05/2008

September 2008 Process Puzzler: Kayo a Drum Problem

Readers suggest ways to improve the performance of a pot

08/13/2008

Quell a Quality Control Confrontation

Readers recommend improvements for a pH control process

10/27/2008

Pumping LPG: Take A Load Off Loading

Readers suggest how to avoid problems in pumping liquefied petroleum gas.

02/28/2013

Process Puzzler: Veto the Proposed Vent Scrubber

Its design suffers from serious mechanical and safety deficiencies.

07/31/2013

Process Puzzler: Tell the Bosses the Truth

Management’s goal for a material balance likely isn’t feasible.

10/15/2009

Process Puzzler: Tame Tower Temperature Turmoil

Start-up conditions may provide key insights about what's causing problems.

09/20/2012