Perspectives: Process Puzzler

Process Puzzler: Hold Off on a Hydrogen Hike

Consider other options than increasing the feed of fresh hydrogen

*THIS MONTH’S PUZZLER* We’re planning to increase the capacity of a diesel hydrotreater unit by replacing part of the recycle hydrogen currently used with fresh hydrogen from an existing 1,200-psig system. The header begins as an 18-in., schedule-80 pipe. The control valves are each fed from a line right off the header.* Figure 1* (http://goo.gl/S801qN) shows what the header system looks like: the 1,600-ft line now handles a flow of 868 million standard cubic feet per day (MMSCFD) of hydrogen; the expansion will raise the total flow to 918 MMSCFD. One branch delivers 5 MMSCFD to isomerization. Another branch services a variety of hydrotreaters. It runs 2,500 ft and furnishes 200 MMSCFD to a hydrocracker, and then goes 3,100 ft where a common branch feeds two diesel hydrotreaters, which get 75 MMSCFD and 63 MMSCFD, respectively, and an ultra-low-sulfur diesel (ULSD) hydrotreater, which is fed 75 MMSCFD. After the diesel header, the line decreases in size to 12 in. and goes 2,700 ft to a kerosene hydrotreater fed 85 MMSCFD. It then continues 2,600 ft to a naphtha hydrotreater that gets 75 MMSCFD and to another header that delivers 140 MMSCFD to a gasoline hydrotreater and 150 MMSCFD to a fluid catalytic cracker (FCC) hydrotreater. The expansion will increase the hydrogen flow to the diesel hydrotreater 2 to 113 MMSCFD from 63; the % open for the control valve only will increase to 76% from 61%, so the project has been approved. The flows are all nominal-high values. A production engineer now is questioning the idea of increasing the fresh H2 output; he’s afraid it will put a strain on the system. What do you think?   *LOOK AT THE BIG PICTURE* Anytime you increase the system demand by 50 MMSCFD, i.e., 6%, with a pressure control valve (PCV) already at 72%, there will be trouble. Obviously, the compressor supplying the H2 and the control valve are sized together. With higher flow, head will decrease eventually. The rise to 79% open for the PCV probably is caused by a drop in the compressor head.

Read more

More from this perspective...

Title

Process Puzzler: Spike Tank Spikes

Readers suggest how to avoid column feed tank problems.

05/31/2011

Process Puzzler: Sort Out a Steam Condensate System

Readers suggest ways to address water hammer and other problems.

10/07/2013

Process Puzzler: Soothe a Skittish Supervisor

Readers weigh the wisdom of cladding exchanger tubes to answer last month's Process Puzzler.

12/16/2008

Process Puzzler: Sidestep a Scale-up Scare

Readers grapple with a reactor production change.

03/04/2009

Process Puzzler: Serve up better column operation

Readers tackle Chemical Processing's process puzzler question and offer tips about how to keep a stripper column from flooding.

12/21/2004

Process Puzzler: Root Out Rumbling

Measurements can confirm the cause of the problem in the fiber-glass piping.

11/11/2010

Process Puzzler: Restore Reboiler Reliability

Readers recommend ways to keep a thermosiphon operating properly

05/30/2013

Process Puzzler: Replace the Tank

A fiberglass vessel isn't appropriate for the intended use.

11/20/2012

Process Puzzler: Put Railcar Loading Back on Track

Readers suggest how to stop serious safety snags.

04/21/2010

Process Puzzler: Preempt Pump Problems

Readers suggest several options to improve reliability

02/01/2013

Process Puzzler: Master a Musty Mess

Readers suggest how to deal with a contamination source.

08/13/2009

Process Puzzler: Make Solid Progress

Readers suggest ways to improve crystallizer controls.

06/16/2010

Process Puzzler: Look Beyond The Valve

Other factors can contribute to persistent valve leaks.

01/14/2011

Process Puzzler: Keep cables in their place

A Chemical Processing reader was looking for a solution to a cable hanger problem. At his plant, a 200-lb. cable bundle supported by cable hangers fell and injured one man. Read what advice our readers had for him and take a look at next months' question.

02/21/2005

Process Puzzler: Keep Incineration Safe

Readers suggest how to deal with a cyanide-containing fuel.

01/25/2010

Process Puzzler: Kayo a Cascade Control Complication

Readers suggest how to properly regulate an exothermic reaction.

04/24/2009

Process Puzzler: Guard Against Gas

Readers suggest the source of a safety stumper.

11/10/2009

Process Puzzler: Go With Agglomeration

Safely reprocessing flammable polymer dust demands a number of measures.

06/27/2013

Process Puzzler: Fix a Fluidized Bed

Addressing the problems may mandate multiple measures.

04/02/2014

Process Puzzler: Fix a Fluid Flow Flaw

Readers suggest solutions for dryer difficulties.

09/15/2009