Perspectives: Process Puzzler

Get Relief From Valve Popping

Readers suggest ways to address thermal expansion issue.

*THIS MONTH’S PUZZLER* We’re suffering an annoying thermal expansion problem in the ethylene oxide (EO) lines that feed our reactors: pressure relief valves (PRVs) often pop from solar heating, because lines are blocked in, typically for up to ten minutes. (Our design standard assumes horizontal pipe and a maximum ambient temperature of 95°F, which doesn’t occur very often at our Chicago site: solar flux is 38.7 Btu/h-ft2 for the summer solstice.) The PRVs wouldn’t be such a problem but EO can polymerize and cause them to stick open, which is why the covered area under the reactors is Class 1, Division 1, Group B. The EO feed pipe runs at 55 psig at 60°F. The PRVs are set at 145 psig. Barometric pressure is 14.408 psia. The properties of EO at operating conditions are: density, 66.8 lb/ft3; viscosity, 0.302 cP; heat capacity, 0.476 BTU/lb-F; thermal conductivity, 0.0949 BTU/h-ft2-°R; volumetric thermal expansion coefficient, 0.001°F-1; and bulk modulus, 180,000 psi/ft3. Our plant engineer is convinced that two inches of calcium silicate insulation in a stainless steel jacket over our 1½-in. Schedule-80 Type-316 stainless-steel pipe largely will eliminate our PRV reliability problem. What do you think?

Read more

More from this perspective...

Title

A Troubled Process for Producing Surfactant Requires Considerable Change

Readers help sort out a sulfonation in shambles.

12/05/2013

Add Other Options to the Mix

Readers suggest how to improve a blending operation.

03/16/2010

April 2006 Process Puzzler: Fixing a Fouled Flue Gas System

Readers identify the cause of poor absorption in flue gas system in this month's process puzzler.

03/11/2006

April Process Puzzler: What do we tell maintenance?

Readers identify problems with a relief system in April's Process Puzzler.

03/29/2007

August 2008: Designing a desulfurization process

How would you improve this design?

06/01/2008

August Process Puzzler: Avoiding a future accident

Readers suggest possible causes for a mysterious mixer explosion in Chemical Processing's monthly Process Puzzler feature.

08/22/2006

August Process Puzzler: Remove operating problems not just an impurity

Readers suggest how to keep sludge from clogging equipment in this month's Process Puzzler.

08/01/2007

Batch Cooling: Speed Up Cycle Time

Readers recommend ways to expedite the process

07/10/2014

Beat Dryer Difficulties

Readers suggest ways to get a second-hand unit to perform better

03/28/2013

Burst a Bubble

Readers suggest how to preclude ignition-temperature-test failures.

05/08/2012

Chillers Require Cold-Eyed Review

Readers suggest ways to avoid temperatures swings and trips.

11/09/2011

Choose Cleaning Solvent Wisely

Readers raise a variety of issues to consider.

03/17/2011

Clear Up a Compressor Conundrum

Readers decipher a compressor surge.

03/23/2009

Condensate cripples compressor

Readers offer tips on how to keep a standby compressor ready for service.

01/05/2006

Cope With Condenser Constraints

Readers suggest ways to maintain performance on hot days.

12/10/2012

Cure column hiccups

12/29/2005

December Process Puzzler: Debug a weigh feeder

Readers offer ideas for improving reliability of a weigh feeder in Chemical Processing's monthly Process Puzzler feature.

11/29/2006

Don't Be Stumped by a Sump

Several steps can help handle gasoline-laden vent gas.

01/12/2012

Don't Impair Level Measurements

Several factors can prevent two sensors from giving matching readings.

09/21/2010

Don't Scoff At the Expert

Readers recommend significant upgrades to a relief system.

03/21/2012