Perspectives: Process Puzzler

Process Puzzler: Hold Off on a Hydrogen Hike

Consider other options than increasing the feed of fresh hydrogen

*THIS MONTH’S PUZZLER* We’re planning to increase the capacity of a diesel hydrotreater unit by replacing part of the recycle hydrogen currently used with fresh hydrogen from an existing 1,200-psig system. The header begins as an 18-in., schedule-80 pipe. The control valves are each fed from a line right off the header.* Figure 1* (http://goo.gl/S801qN) shows what the header system looks like: the 1,600-ft line now handles a flow of 868 million standard cubic feet per day (MMSCFD) of hydrogen; the expansion will raise the total flow to 918 MMSCFD. One branch delivers 5 MMSCFD to isomerization. Another branch services a variety of hydrotreaters. It runs 2,500 ft and furnishes 200 MMSCFD to a hydrocracker, and then goes 3,100 ft where a common branch feeds two diesel hydrotreaters, which get 75 MMSCFD and 63 MMSCFD, respectively, and an ultra-low-sulfur diesel (ULSD) hydrotreater, which is fed 75 MMSCFD. After the diesel header, the line decreases in size to 12 in. and goes 2,700 ft to a kerosene hydrotreater fed 85 MMSCFD. It then continues 2,600 ft to a naphtha hydrotreater that gets 75 MMSCFD and to another header that delivers 140 MMSCFD to a gasoline hydrotreater and 150 MMSCFD to a fluid catalytic cracker (FCC) hydrotreater. The expansion will increase the hydrogen flow to the diesel hydrotreater 2 to 113 MMSCFD from 63; the % open for the control valve only will increase to 76% from 61%, so the project has been approved. The flows are all nominal-high values. A production engineer now is questioning the idea of increasing the fresh H2 output; he’s afraid it will put a strain on the system. What do you think?   *LOOK AT THE BIG PICTURE* Anytime you increase the system demand by 50 MMSCFD, i.e., 6%, with a pressure control valve (PCV) already at 72%, there will be trouble. Obviously, the compressor supplying the H2 and the control valve are sized together. With higher flow, head will decrease eventually. The rise to 79% open for the PCV probably is caused by a drop in the compressor head.

Read more

More from this perspective...

Title

Process Puzzler: Serve up better column operation

Readers tackle Chemical Processing's process puzzler question and offer tips about how to keep a stripper column from flooding.

12/21/2004

Process Puzzler: Keep cables in their place

A Chemical Processing reader was looking for a solution to a cable hanger problem. At his plant, a 200-lb. cable bundle supported by cable hangers fell and injured one man. Read what advice our readers had for him and take a look at next months' question.

02/21/2005

Process Manufacturing Puzzler: Stop solvent losses

A reader is sufferring significant solvent losses during his batch process. Read about how his peers might solve his problem.

04/01/2005

Process Puzzler: Choose a pump wisely

Readers offer tips about how to choose the best pump for slurry service.

05/25/2005

Cure column hiccups

12/29/2005

Prevent heat-exchanger plugging

Readers suggest how to keep a solvent recovery system running smoothly.

12/30/2005

Track that spill

Chemical Processing's readers offer tips about how to locate and identify a chemical spill.

01/02/2006

Don’t waste your boilers

Chemical Processing's readers offer tips about how to properly isolate a waste heat boiler.

01/02/2006

Know when the end is near

Chemical Processing's readers offer tips about how to determine resin-reaction end point.

01/02/2006

Condensate cripples compressor

Readers offer tips on how to keep a standby compressor ready for service.

01/05/2006

Making sense of temperature sensing

Readers provide solutions to a thermowell problem in this month's Process Puzzler.

01/06/2006

April 2006 Process Puzzler: Fixing a Fouled Flue Gas System

Readers identify the cause of poor absorption in flue gas system in this month's process puzzler.

03/11/2006

May Process Puzzler: Boost the reliability of a solvent supply pump

Readers suggest solutions to cavitation in this month's Process Puzzler.

05/25/2006

July Process Puzzler: Prevent the burn-out of a mixer

Readers suggest quick solutions to a solid-liquid mixing problem in Chemical Processing's monthly Process Puzzler feature.

06/28/2006

August Process Puzzler: Avoiding a future accident

Readers suggest possible causes for a mysterious mixer explosion in Chemical Processing's monthly Process Puzzler feature.

08/22/2006

September Process Puzzler: Uncovering cause of solid build-up

Readers offer suggestions to improve reliability of a vibrating screen in Chemical Processing's monthly Process Puzzler feature.

09/14/2006

October Process Puzzler: Improve centrifuge separation capacity, quality

Readers offer suggestions to improve centrifuge separation capacity and quality in Chemical Processing's monthly Process Puzzler feature.

09/29/2006

November Process Puzzler: Consider options for automation

Readers suggest ways to automate an HCl absorber in this month's Process Puzzler in Chemical Processing.

10/31/2006

December Process Puzzler: Debug a weigh feeder

Readers offer ideas for improving reliability of a weigh feeder in Chemical Processing's monthly Process Puzzler feature.

11/29/2006

January Process Puzzler: Sticky valve

Readers offer ideas for the cause of a sticky valve in Chemical Processing's monthly Process Puzzler feature.

01/03/2007