Perspectives: Process Puzzler

Get Relief From Valve Popping

Readers suggest ways to address thermal expansion issue.

*THIS MONTH’S PUZZLER* We’re suffering an annoying thermal expansion problem in the ethylene oxide (EO) lines that feed our reactors: pressure relief valves (PRVs) often pop from solar heating, because lines are blocked in, typically for up to ten minutes. (Our design standard assumes horizontal pipe and a maximum ambient temperature of 95°F, which doesn’t occur very often at our Chicago site: solar flux is 38.7 Btu/h-ft2 for the summer solstice.) The PRVs wouldn’t be such a problem but EO can polymerize and cause them to stick open, which is why the covered area under the reactors is Class 1, Division 1, Group B. The EO feed pipe runs at 55 psig at 60°F. The PRVs are set at 145 psig. Barometric pressure is 14.408 psia. The properties of EO at operating conditions are: density, 66.8 lb/ft3; viscosity, 0.302 cP; heat capacity, 0.476 BTU/lb-F; thermal conductivity, 0.0949 BTU/h-ft2-°R; volumetric thermal expansion coefficient, 0.001°F-1; and bulk modulus, 180,000 psi/ft3. Our plant engineer is convinced that two inches of calcium silicate insulation in a stainless steel jacket over our 1½-in. Schedule-80 Type-316 stainless-steel pipe largely will eliminate our PRV reliability problem. What do you think?

Read more

More from this perspective...

Title

Prevent Serial Coating Problems

Readers suggest how to successfully put aspartame on corn flakes

09/11/2014

Ensure a Satisfactory Steam System

Readers suggest ways to improve steam operations

08/13/2014

Batch Cooling: Speed Up Cycle Time

Readers recommend ways to expedite the process

07/10/2014

Process Puzzler: Confront Column Constraints

Upgrading an atmospheric tower may require operational and design changes.

05/20/2014

Preclude Pump Problems

Achieving adequate performance requires multiple measures

04/16/2014

Process Puzzler: Fix a Fluidized Bed

Addressing the problems may mandate multiple measures.

04/02/2014

Vanquish Vacuum Distillation Difficulties

Readers recommend a variety of improvements.

03/12/2014

Keep Oil Sampling Safe

Any sample cooler requires a pressure relief valve

02/11/2014

Kayo Another Compressor Catastrophe

Reciprocating unit requires multiple revisions.

01/20/2014

A Troubled Process for Producing Surfactant Requires Considerable Change

Readers help sort out a sulfonation in shambles.

12/05/2013

Options May Improve Aniline Removal From Wastewater

Readers offer suggestions for a two-stage countercurrent solvent extraction process.

11/12/2013

Process Puzzler: Sort Out a Steam Condensate System

Readers suggest ways to address water hammer and other problems.

10/07/2013

Slop Oil System Is Too Sloppy

Addressing safety and environmental issues will demand major modifications

08/28/2013

Process Puzzler: Veto the Proposed Vent Scrubber

Its design suffers from serious mechanical and safety deficiencies.

07/31/2013

Process Puzzler: Go With Agglomeration

Safely reprocessing flammable polymer dust demands a number of measures.

06/27/2013

Process Puzzler: Restore Reboiler Reliability

Readers recommend ways to keep a thermosiphon operating properly

05/30/2013

Forestall Fermenter Fouling

Readers suggest how to properly clean unit to eliminate scourge of wild yeast .

05/20/2013

Beat Dryer Difficulties

Readers suggest ways to get a second-hand unit to perform better

03/28/2013

Pumping LPG: Take A Load Off Loading

Readers suggest how to avoid problems in pumping liquefied petroleum gas.

02/28/2013

Process Puzzler: Preempt Pump Problems

Readers suggest several options to improve reliability

02/01/2013