More Exchanger Area Can Pose Pitfalls

This "obvious solution" for heat-transfer problems may not work.


By Andrew Sloley, Contributing Editor

Severe fouling in heat exchangers presents a common problem with an obvious solution — providing more area for heat transfer. The idea is that the larger area will allow adequate heat transfer even with the exchanger fouled.

Unfortunately, making a heat exchanger with a larger area has physical implications. For shell-and-tube exchangers, the situation is simplest for the tube-side.

Extra area comes from some combination of more tubes and longer tubes in a pass. More tubes lower tube velocities, which make most fouling mechanisms more rapid. The faster fouling quickly reduces, or eliminates, the benefit of more surface area, as many a plant has discovered.

The lower velocities affect the required exchanger size for clean operation, as well. Most heat-transfer coefficients drop with lower velocities. The impact may vary from relatively unimportant to very important depending upon the contribution of shell-side heat-transfer effects versus tube-side ones.

A larger exchanger with more or longer tube passes increases pressure drop. Typical practice in buying a new exchanger is for the vendor to use all available pressure drop. This normally gives the lowest cost exchanger.

However, if you specify pressure drop at a maximum value and a particular over-surface ratio (say, 25%), you may end up with a final exchanger different than you expect. To get the pressure drop at the higher surface area requires lower velocities, forcing the exchanger toward some combination of both more flow area and more flow length.

As a prudent engineering practice with high fouling services, always include a specification for velocity as well as pressure drop. Consider putting two pressure drops on the specification for the new exchanger — one for the "standard" conditions and a second for the "over-surface required." Additionally, think about the effect of highly fouling conditions on film thickness and the impact of extra pressure drop on the exchanger.

Shell-side situations are more complex. Modifying the baffle cut and spacing can compensate for overall pressure drop in larger exchangers resulting from extra area. Longer exchangers use baffles further apart and cut more to prevent pressure drop from getting too high. Larger diameter exchangers can compensate with baffles closer together and cut less to keep pressure drop up.

Most services will have baffle cut and spacing that gives a minimum fouling rate for a given shell diameter. Extreme spacing or baffle cut, either too much or too little, creates velocity changes in the shell-side fluid. This leads to eddy currents in the flow pattern. Most shell-side fouling results from extremely low velocities in areas around the baffles near the shell. More eddy currents in the flow pattern worsen the fouling in these areas. Figure 1 compares too much flow restriction, just right, and too little flow restriction for a shell-and-tube exchanger.

Making the baffle cut or spacing tighter uses pressure drop for no benefit. Needing a larger cut or spacing to meet pressure drop requirements increases fouling rate.

The combination of constraints on the shell-side and the tube-side can impose extremely difficult trade-offs. No combination of conventional choices may allow for improved exchanger performance.

In recent years, vendors have introduced a range of proprietary and semi-properietary designs that offer considerable flexibility on the shell-side. Each is attractive in certain situations but not others. Today, I generally favor the helical baffle exchanger, which now is available in several variants. In all of these, a set of partial baffles are angled to eliminate the dead areas where fouling occurs (Figure 2). The baffle arrangement also improves heat transfer by increasing the fluid velocity in the dead areas. In addition, the exchangers have lower pressure drops on the shell-side for the same heat transfer.

The helical baffle expands the range of operability for improving heat transfer in shell-side fouling services. Even if you don't take credit for reduced fouling rates, the lower pressure drop permits adding more surface area while keeping average shell-side velocities up.


ANDREW SLOLEY is a Chemical Processing Contributing Editor. You can e-mail him at Asloley@putman.net


More From This Perspective

More Exchanger Area Can Pose Pitfalls
02/01/2012
This "obvious solution" for heat-transfer problems may not work.

Do Liquid Injection Right
01/05/2012
A variety of factors influence performance.

Let the Buyer Beware
11/21/2011
Understand common dangers when developing specifications and evaluating bids.

Tackle Tray Trade-Offs
10/26/2011
Find the right compromise between process and mechanical requirements.

Watch Out For Dead-Legs
09/27/2011
Lack of flow doesn't mean lack of problems.

Distill Your Internals Choice
09/01/2011
Some general guidelines can ease the selection process.

Take a Different Look at Centrifugal Pumps
07/25/2011
An unconventional assessment can provide insights for effective control.

Pick the Proper Centrifugal Pump
07/11/2011
Consider the impact of startup conditions and prospective operating points.

Don't Calculate Pressure Drops in a Vacuum
06/08/2011
Consider flow regime boundaries and the limitations of methods.

Find the Real Maximum Pressure Of Vessels
04/21/2011
Always consider static head when assessing pressure vessels.

Properly Assess Energy Recovery Projects
03/09/2011
Impact on other operations and transfer prices may alter the economics.

Consider More Than Static Mixers
01/31/2011
A number of technologies can handle pipeline mixing.

Water Heating Raises More Than Temperature
01/10/2011
A key tradeoff complicates the choice between steam and hot oil systems.

Control Challenges Can Pinch Energy Savings
11/03/2010
Heat integration can make achieving effective control more difficult.

Don't Err With Air-Fin Exchangers
10/04/2010
Take considerable care when specifying maximum air temperature.

Watch Out for Two-Phase Flow
08/30/2010
Process performance can suffer dramatically when a liquid flashes unexpectedly.

Rethink Reactor Temperature Control
07/13/2010
Cascade strategy offers simplicity and fast response.

Software: Show Some Skepticism
06/14/2010
Calculated results require critical analysis.

Properly Trigger Standby Pumps
05/06/2010
A pressure signal works for many but not all situations.

How Important is Piping Symmetry?
04/05/2010
Designers should consider the impact of unequal flows in branches.

Improve Your Plant's Prospects
03/04/2010
Keep economics and the lifecycle stage of a facility in mind .

Check What You're Ordering
02/04/2010
A mistake on a purchase order can buy trouble.

Take a Load Off Loading
01/11/2010
Some pipelines may benefit from more than "optimum" insulation.

Plant InSites: Come Up With a Solid Estimate
12/14/2009
Use geometry to figure out the amount of material in storage or equipment.

Assess the Gravity of the Situation
11/09/2009
Flow systems without pumps demand particular attention.

Plant InSites: Don’t Make Problems for Your Plant
10/22/2009
Local fabrication may seem attractive but can degrade performance.

Will You Really Realize Energy Savings?
09/10/2009
Heat integration may deliver complications instead of expected benefits.

Cut Pump Speed to Cut Problems
08/10/2009
Lower rpm can translate into higher reliability.

View Data from a Different Perspective
07/23/2009
Re-plotting by flipping the parametric lines can provide important insights.

Utility Systems: Don't Rely on Pot Luck
06/16/2009
Paying attention to the condensate system can keep you out of hot water.

Nix Nozzle Nuisances
05/20/2009
Avoid flow problems by considering the impact of inlet losses.

Keep Bundle Blunders at Bay
03/16/2009
Combining air coolers can provide savings but also pose problems.

Take Control Down a Level
02/23/2009
Sometimes you can design out the need for instrumentation.

Troubleshooting: Take to the Field
01/30/2009
Troubleshooting demands getting into the plant to inspect units.

Steam Systems: Simple Solutions Can Prompt Complex Problems
12/23/2008
Steam systems are especially susceptible to developing difficulties

Stripper Bares All
11/21/2008
Analysis reveals how operating practices compounded design mistakes

Full Vacuum Rating Isn't an Empty Benefit
10/16/2008
It often can provide important but underappreciated advantages for vessels

Plant InSites: Look Beyond the Lore
10/10/2008
Don’t rely on recollections about how a unit had performed

Right Vacuum Control Choice Takes the Pressure Off
08/07/2008
Choosing the proper recycle stream for regulation is crucial

Use water to check vessel integrity
06/25/2008
Hydrostatic testing offers advantages but requires care

Understand the cold facts about subcooling
06/04/2008
Systems sometimes can surmount major layout errors

Plant InSites: Cast a cold eye on columns
05/23/2008
Subcooling can complicate and compromise tower performance

Don’t stack the deck against yourself
03/14/2008
Always consider future expansions before finalizing layouts

Keep parallel pumps in line
02/13/2008
Mind the curves when using different size pumps.

Carefully check vendor references
10/30/2007
Determine the differences between a cited installation and yours, Andrew Sloley, contributing editor, says in this month's Plant InSites column.

Do some heavy thinking about light loads
10/01/2007
Cutting steam demand can get you into hot water, advises Contributing Editor Andrew W. Sloley, contributing editor, in this month's Plant InSites column.

Correct those disturbing lapses
08/31/2007
Keeping liquid in a reflux drum still can prevent problems, says Andrew Sloley, in this month's Plant InSites column.

Don’t look at precondensers in a vacuum
08/20/2007
Consider the impact of the downstream vacuum ejector on precondenser performance, advises Andrew Sloley, in this month's Plant InSites column.

Properly protect centrifugal pumps
07/11/2007
Consider various factors when selecting how to guard against low flow, Andrew Sloley says in this month's Plant Insites column.

Teaming two solutions can be counterproductive
06/06/2007
Sometimes things just don’t add up as expected. Andrew Sloley discusses how sometimes two solutions aren't always better than one solution.

Keep others from making “classic” mistakes
04/24/2007
A heat exchanger problem provides a textbook example of design limitations, according to Contributing Editor Andrew Sloley.

Don’t let parallel pumps cross you up
03/28/2007
Small differences with parallel pumps can lead to big difficulties, according to Andrew Sloley in this month's Plant InSites column.

Make sure you’ve got a good flange match
03/06/2007
Standard large-diameter flanges don’t necessarily mate. Andrew Sloley provides insight in this month's Plant Insites column.

Take the pressure off pressure control
02/19/2007
Linkage of other variables can stymie hot vapor bypass schemes, according to Andrew Sloley's Plant InSites column.

Understand and Control Hot Vapor Bypass
01/08/2007
Contributing Editor Andrew Sloley says pressure control technique works well if implemented properly, in this month's Plant InSites column.

Make jacketing your strong suit
12/05/2006
Small details in jacketed-pipe configuration can have a big impact, according to Chemical Processing's Contributing Editor Andrew Sloley.

Column configuration can cripple performance
09/21/2006
The importance of having the inherent capability to meet operating requirements and enable proper instrumentation performance is stressed by Contributing Editor Andrew Sloley.

Heat integration steps can present control problems
09/13/2006
The more energy prices rise, the more heat integration saves. However, heat integration steps can present complex control problems. Slip-ups in putting control systems in place can make operations nearly impossible. That certainly was the case at one unit using heat recovery.

Spot problems with adsorbents
08/14/2006
The longer-than-expected life of an adsorbent points up the need to always assess the consequences of system additions. While sometimes this may involve detailed calculations, simply looking to the laws of physics can eliminate potential headaches.

Keep a steady eye on measurements
06/19/2006
While engineers often strive to keep processes running without too much variation, measurements that don’t change may be a cause for concern not celebration, as one refinery can attest.

Find the real cause of pump gas up
04/17/2006
Simply blaming high feed temperature for inadequate suction isn’t enough when diagnosing pump problems. Read this article to get a laundry list of causes for pump gas up.

Keep measurements on the level
04/17/2006
Changes in liquid densities can throw off readings. Plants commonly rely on differential pressure (DP) cells to measure level. Read this month's Plant InSites for advice on how to solve these level problems.

Can you trust your sight glasses?
02/17/2006
Sight glasses are invaluable for troubleshooting towers and checking instruments. Improper connections can take a toll on accuracy.

Is achieving design conditions realistic?
08/29/2005
Many factors can influence how equipment should be operated.

Process Engineering: Inspect with your mind, not just your eyes
03/11/2005
A thorough inspection of plant equipment following tiny installations can prevent a lot of future problems. Go beyond just checking for compliance with drawings when looking at hardware and physically look at the equipment itself.

Process Engineering: Poor compressor design puts pressure on pumps
01/18/2005
When a poor compressor design put too much pressure on the pumps, a new solution had to be constructed.  Sometimes the ideal solution is just an intricate compromise.

Save a bundle solving pressure-drop problems
11/04/2004
Pressure drop in compressor-suction and interstage coolers often creates problems. In some cases, just a few pounds of extra pressure drop make a revamp unworkable.

Give gaskets a squeeze
09/16/2004
Reevaluate gasket use when operating conditions or maintenance procedures change.

Sidestep side-draw control surprises
07/01/2004
The simplest approach to control side-draw distillation columns uses flow control on the side product. This solution, however, is not ideal for all side-draw control situations.

Preheater points out the value of cooling off
05/12/2004
Lack of attention to detail in conceptual design can hide many sins. Put the problem aside and then ponder it again. A fresh look may lead to an even better solution.

Tackle Tough Services for Centrifugal Pumps with Care
03/11/2004

Don't Let Heater Control Get You Steamed
03/03/2004