Get Valid Samples

Materials’ selection and piping design markedly can affect results.

By Andrew Sloley, Contributing Editor

Certain processes — such as those for electronic chemicals, monomers feeding high-yield polymer streams, and high-purity steam generators — routinely require analysis of ppb concentrations. Getting accurate laboratory results demands special configurations and handling. Factors that may affect sample validity include absorption of chemicals onto tubing or container surfaces and trace contaminants.

Sampling methods for these systems require special attention to sample integrity. While specifics vary depending upon the process, many common factors come into play. The most important of these often revolve around getting a representative sample.

At ppb levels, surface interactions between the process and the piping can become important. In some systems, the piping surface won’t reach equilibrium with the process until weeks or even months of exposure. Dynamic changes also influence compositions. Specific components may absorb onto the surface of the pipe; then, as bulk concentrations drop or conditions change, they desorb.

Surface sorption effects depend upon the ratio of surface area to flow cross-section: the larger the diameter of the sample system piping, the lower the surface-area/cross-section ratio — and the impact of sorption on sample integrity.

However, conventional sampling systems often include a connection segment that normally has no flow. The need to flush this segment prior to sampling incurs a cost in lost material that can pose a significant economic penalty for systems with high-value compounds. Opting for a smaller-diameter sampling line minimizes the cost.

Two key steps help improve sample integrity. First, select sampling system materials that will prevent or reduce sorption effects. Second, use a “fast loop” or sidestream sampling system with continuous flow at all times.

Materials’ selection depends upon the system. For example, many electronic chemicals systems work well with stainless steel pipe. As long as the correct grade is selected and properly conditioned before service, sorption effects are minimal. In contrast, systems sampling for hydrogen sulfide at low levels never should use stainless steel because the sorption effects can be very significant. Good choices for low-level hydrogen sulfide monitoring are polytetrafluoroethylene-lined pipe for moderate conditions and high-nickel alloys for more severe services. Investigate the service to understand your choices.

A fast loop provides a parallel path for flow; the continuous flow prevents dead legs. The loop usually contains the sample container. When a sample is needed, valves isolate the container, and then a new one immediately is placed into service. Extremely high-purity systems may include purging of the new container to prevent material from it contaminating the system.

The fast loop must be placed in parallel with a pressure drop (∆P). Figure 1 shows some commonly used options.

Having the fast loop in parallel with process equipment such as a control valve or heat exchanger usually minimizes operating and installation costs. However, it also creates a new flow path. This may change potential consequences of failures. It also may make more complex the procedures for equipment isolation while the unit is running. So, sometimes, placing the loop in parallel to operating equipment may not be a good choice.

A better option in such cases may be to install a restriction orifice specifically to generate flow for the fast loop. Such a stand-alone package provides more flexibility in installation but the orifice will add pressure drop in the system that may increase energy costs or reduce unit capacity. If necessary, the orifice can be installed between flanges or welded-in if flanges are considered leak or contamination points.

The configurations shown all assume simple single-phase sampling. If the system is two phase, getting a representative sample becomes much more complex. Isokinetic sampling (see: “Don’t Be Fazed by Multiphase Sampling") is required to get the slipstream. Piping configurations must prevent phase separation from creating unrepresentative samples.

The position and orientation of sampling nozzles also can significantly affect analyzer results (see: “Properly Position Sampling Nozzles").

Without good samples, controlling the process can be difficult and expensive mistakes can occur. While specifics of high-fidelity sampling systems vary with the process, accounting for sorption effects and using fast-loop systems can help ensure getting truly representative samples.


ANDREW SLOLEY is a Contributing Editor to Chemical Processing. You can e-mail him at
ASloley@putman.net

More from this perspective...

Title

Take the pressure off pressure control

Linkage of other variables can stymie hot vapor bypass schemes, according to Andrew Sloley's Plant InSites column.

02/19/2007

Understand and Control Hot Vapor Bypass

Contributing Editor Andrew Sloley says pressure control technique works well if implemented properly, in this month's Plant InSites column.

01/08/2007

Make jacketing your strong suit

Small details in jacketed-pipe configuration can have a big impact, according to Chemical Processing's Contributing Editor Andrew Sloley.

12/05/2006

Column configuration can cripple performance

The importance of having the inherent capability to meet operating requirements and enable proper instrumentation performance is stressed by Contributing Editor Andrew Sloley.

09/21/2006

Heat integration steps can present control problems

The more energy prices rise, the more heat integration saves. However, heat integration steps can present complex control problems. Slip-ups in putting control systems in place can make operations nearly impossible. That certainly was the case at one unit using heat recovery.

09/13/2006

Spot problems with adsorbents

The longer-than-expected life of an adsorbent points up the need to always assess the consequences of system additions. While sometimes this may involve detailed calculations, simply looking to the laws of physics can eliminate potential headaches.

08/14/2006

Keep a steady eye on measurements

While engineers often strive to keep processes running without too much variation, measurements that don’t change may be a cause for concern not celebration, as one refinery can attest.

06/19/2006

Keep measurements on the level

Changes in liquid densities can throw off readings. Plants commonly rely on differential pressure (DP) cells to measure level. Read this month's Plant InSites for advice on how to solve these level problems.

04/17/2006

Find the real cause of pump gas up

Simply blaming high feed temperature for inadequate suction isn’t enough when diagnosing pump problems. Read this article to get a laundry list of causes for pump gas up.

04/17/2006

Can you trust your sight glasses?

Sight glasses are invaluable for troubleshooting towers and checking instruments. Improper connections can take a toll on accuracy.

02/17/2006

Is achieving design conditions realistic?

Many factors can influence how equipment should be operated.

08/29/2005

Process Engineering: Inspect with your mind, not just your eyes

A thorough inspection of plant equipment following tiny installations can prevent a lot of future problems. Go beyond just checking for compliance with drawings when looking at hardware and physically look at the equipment itself.

03/11/2005

Process Engineering: Poor compressor design puts pressure on pumps

When a poor compressor design put too much pressure on the pumps, a new solution had to be constructed.  Sometimes the ideal solution is just an intricate compromise.

01/18/2005

Save a bundle solving pressure-drop problems

Pressure drop in compressor-suction and interstage coolers often creates problems. In some cases, just a few pounds of extra pressure drop make a revamp unworkable.

11/04/2004

Give gaskets a squeeze

Reevaluate gasket use when operating conditions or maintenance procedures change.

09/16/2004

Sidestep side-draw control surprises

The simplest approach to control side-draw distillation columns uses flow control on the side product. This solution, however, is not ideal for all side-draw control situations.

07/01/2004

Preheater points out the value of cooling off

Lack of attention to detail in conceptual design can hide many sins. Put the problem aside and then ponder it again. A fresh look may lead to an even better solution.

05/12/2004

Tackle Tough Services for Centrifugal Pumps with Care

03/11/2004

Don't Let Heater Control Get You Steamed