Think Straight About Orifice Plates
Insufficient flow conditioning often undermines measurement accuracy.
Plants frequently rely on differential pressure created by an obstruction in a line to measure flow. Accuracy depends upon two factors: the correctness of the differential pressure measurement obtained via taps upstream and downstream, and the calculation for turning that measurement into a flow rate.
The obstruction placed in the line most often is an orifice plate — a flat plate with a machined orifice. (For more on orifice plates, see: "Remember the Old Reliable Orifice Plate," for other differential-pressure flow metering options, see: "Look Beyond Orifice Plates.") Orifice plates are cheap and reliable. Moreover, orifice plates manufactured to specific dimensions and tolerances generate known pressure drops for a given flow rate. The International Standards Organization (ISO) has summarized the dimensional criteria; all reputable orifice-plate manufacturers meet these standards.
ISO standards also cover installation requirements. Proper installation plays a crucial role in achieving accurate orifice-plate measurements. The major criteria include a stable flow pattern, a fluid-filled pipe and an unobstructed flow path (no blockages). If these criteria are met, flow meter calculations can be based on the physical dimensions of the system; no in-place measurement or calibration is required.
Let's look in detail at the first requirement, a stable flow pattern. An oft-repeated rule of thumb states that a length of straight-run pipe equal to 10–15 piping diameters creates a sufficiently stable flow pattern. How does this compare to the ISO standards?
The ISO standards include multiple upstream piping configurations — from fully open full-bore valves upstream and downstream to multiple right-angle turns to tee-branch connections. They also detail for multiple values of β — the orifice diameter/pipe diameter, in consistent units — the length of straight-run piping required (Table 1). In general, the lower the β, the shorter the pipe run necessary. During piping design, the final β ratio is unknown. So, many engineering standards attempt to reduce overall cost by specifying a maximum β of 0.55 to 0.63.
The best cases are fully open full-bore valves with a straight run upstream of them, and a single right-angle bend upstream. The required piping runs for a 0.55 β are 13 diameters for the full-bore valves and 16 diameters for the single right-angle bend. Every other configuration is worse — in some cases, much worse. Higher β values increase upstream requirements.
For two 90° bends in series, an orifice with a 0.55 β requires 44 diameters of upstream piping to meet ISO standards. Even with properly installed straightening vanes, this layout needs 22 diameters. A β of 0.84 raises the requirement to 40+ diameters for all types of installations.
What this all means is that if your plant needs maximum accuracy, use lots of pipe run upstream of orifice plates. In some cases, 90 diameters are necessary. Additionally, if you're having flow meter problems, check the installation. I've observed many orifice meters inside process units that don't meet ISO standards. The 10–15-diameters rule only applies to a "best case" — i.e., everything else is done correctly and a low-β orifice plate is installed. Most industrial installations require 20+ diameters. Using straightening vanes can help, but doesn't completely solve the problem. The toughest installations are downstream of flow branches and where multiple elbows in series are at right angles to each other. To paraphrase a quote from pump installation guidelines, the only thing worse than one elbow upstream of a flow orifice is two elbows.
While a plant may start with low-β orifice plates, as hydraulics become tighter it may put in new plates with lower pressure drops (and higher β values). Installing a short run of larger diameter pipe doesn't solve the problem (Figure 1). The upstream expansion creates a flow pattern with unknown effect on the orifice meter.
If the piping configuration doesn't meet ISO standards, accuracy will suffer. For monitoring unit trends, reduced accuracy may be an acceptable tradeoff for a cheaper meter installation. For high and reliable accuracy, always follow the ISO requirements.
ANDREW SLOLEY is a contributing editor to Chemical Processing. You can e-mail him at Asloley@putman.net.
More from this perspective...
| Title | Date |
|---|---|
|
Dont look at precondensers in a vacuum Consider the impact of the downstream vacuum ejector on precondenser performance, advises Andrew Sloley, in this month's Plant InSites column. |
08/20/2007 |
|
Properly protect centrifugal pumps Consider various factors when selecting how to guard against low flow, Andrew Sloley says in this month's Plant Insites column. |
07/11/2007 |
|
Teaming two solutions can be counterproductive Sometimes things just dont add up as expected. Andrew Sloley discusses how sometimes two solutions aren't always better than one solution. |
06/06/2007 |
|
Keep others from making classic mistakes A heat exchanger problem provides a textbook example of design limitations, according to Contributing Editor Andrew Sloley. |
04/24/2007 |
|
Dont let parallel pumps cross you up Small differences with parallel pumps can lead to big difficulties, according to Andrew Sloley in this month's Plant InSites column. |
03/28/2007 |
|
Make sure youve got a good flange match Standard large-diameter flanges dont necessarily mate. Andrew Sloley provides insight in this month's Plant Insites column. |
03/06/2007 |
|
Take the pressure off pressure control Linkage of other variables can stymie hot vapor bypass schemes, according to Andrew Sloley's Plant InSites column. |
02/19/2007 |
|
Understand and Control Hot Vapor Bypass Contributing Editor Andrew Sloley says pressure control technique works well if implemented properly, in this month's Plant InSites column. |
01/08/2007 |
|
Make jacketing your strong suit Small details in jacketed-pipe configuration can have a big impact, according to Chemical Processing's Contributing Editor Andrew Sloley. |
12/05/2006 |
|
Column configuration can cripple performance The importance of having the inherent capability to meet operating requirements and enable proper instrumentation performance is stressed by Contributing Editor Andrew Sloley. |
09/21/2006 |
|
Heat integration steps can present control problems The more energy prices rise, the more heat integration saves. However, heat integration steps can present complex control problems. Slip-ups in putting control systems in place can make operations nearly impossible. That certainly was the case at one unit using heat recovery. |
09/13/2006 |
|
The longer-than-expected life of an adsorbent points up the need to always assess the consequences of system additions. While sometimes this may involve detailed calculations, simply looking to the laws of physics can eliminate potential headaches. |
08/14/2006 |
|
Keep a steady eye on measurements While engineers often strive to keep processes running without too much variation, measurements that dont change may be a cause for concern not celebration, as one refinery can attest. |
06/19/2006 |
|
Keep measurements on the level Changes in liquid densities can throw off readings. Plants commonly rely on differential pressure (DP) cells to measure level. Read this month's Plant InSites for advice on how to solve these level problems. |
04/17/2006 |
|
Find the real cause of pump gas up Simply blaming high feed temperature for inadequate suction isnt enough when diagnosing pump problems. Read this article to get a laundry list of causes for pump gas up. |
04/17/2006 |
|
Can you trust your sight glasses? Sight glasses are invaluable for troubleshooting towers and checking instruments. Improper connections can take a toll on accuracy. |
02/17/2006 |
|
Is achieving design conditions realistic? Many factors can influence how equipment should be operated. |
08/29/2005 |
|
Process Engineering: Inspect with your mind, not just your eyes A thorough inspection of plant equipment following tiny installations can prevent a lot of future problems. Go beyond just checking for compliance with drawings when looking at hardware and physically look at the equipment itself. |
03/11/2005 |
|
Process Engineering: Poor compressor design puts pressure on pumps When a poor compressor design put too much pressure on the pumps, a new solution had to be constructed. Sometimes the ideal solution is just an intricate compromise. |
01/18/2005 |
|
Save a bundle solving pressure-drop problems Pressure drop in compressor-suction and interstage coolers often creates problems. In some cases, just a few pounds of extra pressure drop make a revamp unworkable. |
11/04/2004 |