Perspectives: Plant InSites

Think Straight About Orifice Plates

Insufficient flow conditioning often undermines measurement accuracy.

By Andrew Sloley, Contributing Editor

Plants frequently rely on differential pressure created by an obstruction in a line to measure flow. Accuracy depends upon two factors: the correctness of the differential pressure measurement obtained via taps upstream and downstream, and the calculation for turning that measurement into a flow rate.

The obstruction placed in the line most often is an orifice plate — a flat plate with a machined orifice. (For more on orifice plates, see: "Remember the Old Reliable Orifice Plate," for other differential-pressure flow metering options, see: "Look Beyond Orifice Plates.") Orifice plates are cheap and reliable. Moreover, orifice plates manufactured to specific dimensions and tolerances generate known pressure drops for a given flow rate. The International Standards Organization (ISO) has summarized the dimensional criteria; all reputable orifice-plate manufacturers meet these standards.

ISO standards also cover installation requirements. Proper installation plays a crucial role in achieving accurate orifice-plate measurements. The major criteria include a stable flow pattern, a fluid-filled pipe and an unobstructed flow path (no blockages). If these criteria are met, flow meter calculations can be based on the physical dimensions of the system; no in-place measurement or calibration is required.

Let's look in detail at the first requirement, a stable flow pattern. An oft-repeated rule of thumb states that a length of straight-run pipe equal to 10–15 piping diameters creates a sufficiently stable flow pattern. How does this compare to the ISO standards?

The ISO standards include multiple upstream piping configurations — from fully open full-bore valves upstream and downstream to multiple right-angle turns to tee-branch connections. They also detail for multiple values of β — the orifice diameter/pipe diameter, in consistent units — the length of straight-run piping required (Table 1). In general, the lower the β, the shorter the pipe run necessary. During piping design, the final β ratio is unknown. So, many engineering standards attempt to reduce overall cost by specifying a maximum β of 0.55 to 0.63.

The best cases are fully open full-bore valves with a straight run upstream of them, and a single right-angle bend upstream. The required piping runs for a 0.55 β are 13 diameters for the full-bore valves and 16 diameters for the single right-angle bend. Every other configuration is worse — in some cases, much worse. Higher β values increase upstream requirements.

For two 90° bends in series, an orifice with a 0.55 β requires 44 diameters of upstream piping to meet ISO standards. Even with properly installed straightening vanes, this layout needs 22 diameters. A β of 0.84 raises the requirement to 40+ diameters for all types of installations.

What this all means is that if your plant needs maximum accuracy, use lots of pipe run upstream of orifice plates. In some cases, 90 diameters are necessary. Additionally, if you're having flow meter problems, check the installation. I've observed many orifice meters inside process units that don't meet ISO standards. The 10–15-diameters rule only applies to a "best case" — i.e., everything else is done correctly and a low-β orifice plate is installed. Most industrial installations require 20+ diameters. Using straightening vanes can help, but doesn't completely solve the problem. The toughest installations are downstream of flow branches and where multiple elbows in series are at right angles to each other. To paraphrase a quote from pump installation guidelines, the only thing worse than one elbow upstream of a flow orifice is two elbows.

While a plant may start with low-β orifice plates, as hydraulics become tighter it may put in new plates with lower pressure drops (and higher β values). Installing a short run of larger diameter pipe doesn't solve the problem (Figure 1). The upstream expansion creates a flow pattern with unknown effect on the orifice meter.

If the piping configuration doesn't meet ISO standards, accuracy will suffer. For monitoring unit trends, reduced accuracy may be an acceptable tradeoff for a cheaper meter installation. For high and reliable accuracy, always follow the ISO requirements.


ANDREW SLOLEY is a contributing editor to Chemical Processing. You can e-mail him at Asloley@putman.net.

More from this perspective...

Title

Effectively Remove Droplets

Various factors affect the choice and operation of liquid/vapor separators.

03/19/2013

Consider "Pasteurizing" Your Column

A side-draw may cut capital and energy costs for distillation.

02/12/2013

Odd Layout May Make Even More Sense

Unusual tower configuration better copes with control valve failure.

01/23/2013

Heat Exchangers: Is Mist a Must?

Water sprays may boost performance of air-fin exchangers.

01/02/2013

Is Your Vessel Foundation Really Strong Enough?

Certain situations can lead to exceeding design limits.

12/03/2012

Backflush Away Fouling

Flow reversal can remove fiber buildup in heat exchangers.

11/06/2012

Properly Position Interlock Valves

The obvious location may not be the most cost effective

10/16/2012

Piping Geometry: Grasp Line Layout

Draining, venting, fouling and other considerations affect piping geometry.

09/06/2012

Consider Compact Reboilers

Several types of heat exchangers can save space

07/24/2012

Select the Right Reboiler

Understand the strengths and weaknesses of various options.

06/04/2012

Get Your Head Around Velocity Head

Confusion about what the term means can spell trouble.

05/02/2012

Old Doesn't Mean Outdated

Some equations have stood the test of time.

04/04/2012

Vacuum System Fix Fizzles

Use of scavenged equipment leads to problems.

03/07/2012

More Exchanger Area Can Pose Pitfalls

This "obvious solution" for heat-transfer problems may not work.

02/01/2012

Do Liquid Injection Right

A variety of factors influence performance.

01/05/2012

Let the Buyer Beware

Understand common dangers when developing specifications and evaluating bids.

11/21/2011

Tackle Tray Trade-Offs

Find the right compromise between process and mechanical requirements.

10/26/2011

Watch Out For Dead-Legs

Lack of flow doesn't mean lack of problems.

09/27/2011

Distill Your Internals Choice

Some general guidelines can ease the selection process.

09/01/2011

Take a Different Look at Centrifugal Pumps

An unconventional assessment can provide insights for effective control.

07/25/2011