Benchmarking Bolsters Improvement Efforts

Looking at multiple plants worldwide puts opportunities into perspective

By Robert E. Christman and Scott Morris, Genzyme

Founded in 1981 in Boston, Mass., Genzyme has evolved from a tiny startup to one of the world's leading biotech companies, with nearly 10,000 employees and operations in every region of the globe. Our products address rare genetic diseases, multiple sclerosis, cardiovascular disease and endocrinology; we maintain a substantial development program focused on these fields as well as other areas of unmet medical need. Acquired by Sanofi in 2011, Genzyme now benefits from the reach and resources of one of the world's largest pharmaceutical companies, with a shared commitment to improving the lives of patients.

As a company, we were facing many issues common to manufacturers in the pharmaceutical and biotech industry, including:

• compliance challenges, and quality, health and safety, and environmental expectations;
• production downtime impacting product supply due to capacity constraints;
• expected product sales growth;
• market pressures to reduce manufacturing costs; and
• stockholder expectations to operate and maintain the manufacturing assets cost effectively.

Genzyme global engineering decided that setting up a global maintenance and reliability network was an important way to address these issues. So, the vice president of global engineering convened a conference and workshop in the fall of 2009 for site maintenance and reliability professionals worldwide. It brought together people from plants in the U.S., Ireland, the U.K. and Belgium. The event featured a keynote address by our then-CEO demonstrating visible leadership support for the goals of the conference. Our global network recognized that the reliability and maintenance functions at the sites would play an important role in achieving the organizational objectives — and that using a common approach was essential.

We realized many opportunities existed for continuous improvement in maintenance and reliability. But we didn't know which areas to concentrate on first at each site, what areas of opportunity were common among sites, and which sites had good or best practices in place. So the big questions were: "What is the current status of our sites today?," "What are the major themes and opportunities for improvement among the sites?," and "What do we work on first?"

THE ASSESSMENT PROCESS
A global network focus team representing the manufacturing sites chose the common approach, specific assessment tool and schedule. We partnered with Life Cycle Engineering to make certain we were using a proven approach that would deliver the results we needed. We selected a common tool, based on the "Reliability Excellence" model, to ensure consistency of the process to share and compare the results. The site maintenance leadership cosponsored the assessment in conjunction with the global engineering function. However, due to its scope, the assessment also required support from the site leadership.

Planning and executing a site benchmarking assessment isn't a trivial task. Each assessment began with an educational workshop to align the participants and site on the principles, methodology and expectations of the process. The goal was to reach a diversified audience representing all aspects of operations, including manufacturing, quality, health and safety, environmental, engineering, maintenance and site leadership.

This workshop was an important step in building awareness that the principles of reliability and operational excellence aren't just "maintenance-owned responsibilities." By understanding the relationships between reliability, operational excellence and best practices, the participants were better able to relate their roles, responsibilities and the area processes to site objectives through good asset management practices. Positive feedback typically followed the educational workshop and helped set appropriate expectations for the benchmarking assessment process.

The assessment was conducted over a week that included onsite interviews, process shadowing and tours of operations and facilities. The primary obstacle to conducting the assessments was time. Everyone always is busy. That's the nature of industry today — you're expected to be obligated 100% of the time. In recognition of this situation, the challenge was to identify a time to execute the assessment. This typically required several months of advanced notice to have the necessary resources available.

An important element for success was the level of involvement of senior leaders. Some sites had more senior leadership support than others. Such support helped overcome the challenges to executing the assessment. More importantly, site leadership will play a critical role in supporting continuous improvement activities and initiatives that result from the benchmarking assessments.

BENCHMARKING RESULTS
We completed three benchmarking assessments in 2011 and two in the first half of 2012. After finishing the five benchmarking assessments, it was clear that sites had common opportunities for continuous improvement. These areas included: materials management, enterprise asset management (EAM), work planning, work measurement, equipment history, and reliability engineering.

With a roadmap based on our biggest opportunities, the global network developed the first phase of an implementation plan in late 2012 for execution this year. Formal network focus teams have been organized to address materials management, EAM, work planning, work measurement, reliability and equipment history. The purpose of these focus teams is to develop standard business processes and procedures for use at all the sites. Focus team activities also will include strategic training initiatives as needed to support the new processes and procedures. This will ensure consistency within our operations while maximizing the combined efforts of the global network.

We will continue to use the results of the diagnostic over the next two years as a roadmap for developing additional implementation phases. Because continuous improvement is an ongoing journey, expectations and targets must be managed appropriately. The objective of our network is to improve the global performance from an "emerging" to a "proactive" state (Figure 1).

A GOOD START
The decision to conduct benchmarking assessments at Genzyme's sites stemmed from a collective recognition that remediating current deficiencies and achieving future objectives required changes to be made. We realized the first step in deciding where to begin is to understand the current state of the key business processes.

We see real value in approaching site benchmarking assessments on a global basis. However, this isn't a trivial exercise. Success demands:

• understanding and being able to communicate the business case for undertaking the benchmarking assessment;
• ensuring buy-in from all sites involved;
• making certain you educate the sites about why you're doing the benchmarking before the assessment begins; and
• getting senior leaders on board to participate actively and help with providing resources.



ROBERT CHRISTMAN is the associate director of global reliability engineering for Genzyme, Framingham, Mass. SCOTT MORRIS is an associate director supporting global reliability engineering for Genzyme in Framingham. E-mail them at robert.christman@genzyme.com and scott.morris@genzyme.com.

More from this perspective...

Title

Upgraded Cooling System Halves Energy Costs

New layout and speed control also provide other benefits

08/13/2008

Membrane Boasts Material Benefits

As economical separation of contaminants from natural gas becomes increasingly important, simulation eases the design of innovative module to remove carbon dioxide. Membranes offer potential advantages over other methods.

09/11/2007

Chlorine Plant Benefits From PEM Fuel Cells

Skid-mounted stacks convert hydrogen directly into electricity.

12/05/2011

Cooling Water Treatment Provides Sound Results

Teaming ultrasonics with corrosion inhibitors offers environmental and economic benefits.

04/29/2010

Integrated System Improves Operations

Combined process control and safety system cuts costs and boosts efficiency

09/16/2008

Integrated System Improves Operations

Combined process control and safety system cuts costs and boosts efficiency.

10/09/2008

Case Study: Digital Positioner Aids Air Separation

Tighter control enables significant boost in argon output.

07/25/2011

Portable conveyor speeds paint production

Unit ensures a consistent flow of soft acrylic powder without lumps or sticking, improving the production of thermoplastic paint.

10/30/2007

Refinery Pumps Up Energy Savings

Switching to a steam-driven pump enhances condensate return system.

10/06/2010

Plant Pares Water Use and Disposal Costs

Process changes save water and improve water treatment.

02/27/2012

Ethanol Plant Boosts Operating Margin

Model predictive control enables plantwide optimization.

10/27/2011

New Flow Meter Boosts Solvent Recovery and Much More

Improved measurement accuracy delivers better control and savings.

09/09/2010

pH sensor stands up to tough conditions

Design provides improved reliability in a polymer-precursor batch reactor. Sensors must respond quickly and survive a harsh environment. Poor probe reliability can make the difference between a process that makes money and one that doesn’t.

01/08/2007

Safety And The Environment -- "Zero" Really Adds Up

Project gets field issues detected and addressed far faster and more effectively.

06/08/2010

Case Study: Instruments Tame Troublesome Slurry

Two-step approach allows resin plant to more accurately dose additive.

10/16/2009

Low flow injection improves scale-up of catalysts

Dow Chemical recently developed a reactive catalyst for use in one of its production facilities. Indications were that this new catalyst could save the company millions of euros once it reached full-scale production. The challenge was transferring the recipe using this new reactive catalyst from the laboratory to the pilot plant and, ultimately, to the production level.

08/07/2006

Sample pump eliminates emissions

A compact system significantly improves analyzer accuracy. This innovative turnkey solution for analyzer emissions is a solid-state pump with an ultra-sensitive pressure regulator that mixes a compatible gas with the analyzer samples to achieve a constant vent header pressure — even during times of plant upset.

03/20/2007

Chemical Facility Relocation Prompts Safety Moves

Massive project pioneers enhanced safety standards for construction.

04/25/2013

Software Drives OEM Toward Efficiency and Energy Savings

ABB designed software for its ACS800 drive so Curtis-Toledo could improve the operation of its rotary-screw compressors. The customized software can control the system pressure, air delivery, oil temperature and duty cycle directly from the drive.

06/23/2005

Batch Control Gets Easier

Loop tuning package doesn’t demand steady-state operation.

02/04/2009