Perspectives: Making it Work

Innovative Design Tackles Tight Plant Footprint

Dual distillation column approach enables installation of new ethanol extraction technology

By Art Goldmann, EPIC Modular Process Systems

A facility in Illinois wanted to test the viability of a new ethanol extraction technology. However, this would require building a distillation column in a location virtually impossible to reach. Moreover, the unit would have to fit within a tight footprint and its installation would involve intricate rigging. Yet the facility couldn’t be altered to accommodate the new process system. The distillation unit was an add-in to a larger project, and the rest of the facility layout already had been completed. In addition, because of ongoing operations, constructing the system onsite wasn’t an option. To further complicate matters, the installation path involved multiple doorways with fixed dimensions, overhead piping and conduits, and several 90° turns.

“The pre-design site visit was critical. There was no way we could have developed the proper skid design or the detailed rigging plan without that visit. Those measurements were critical, and the path was very tight. The final resting place for the skid was in a very small space along the back wall of the plant. The client knew they needed the distillation system, but they had no idea how to get the system to the final destination,” says Ken Sipes, manager of EPIC’s Process and Mechanical Group. “We knew a modular solution was the answer, but actually getting the skid into the plant meant we couldn’t design the system as one big skid. We had to get creative.”

In response to this problem, the EPIC team devised a two-skids-in-one design. This involved engineering and manufacturing two self-contained units that, when fully installed, would work as one seamless unit (Figure 1). System scale-up with HYSYS software and 3D CAD design were developed around this idea, using lab-scale data and process-and-instrumentation drawings from the client. Finite element analysis performed by an independent source confirmed that each skid would bear the stress of navigating a complicated installation path.

DESIGN OF THE TWO SKIDS
Column diameter and height, piping locations and equipment placement were carefully chosen to fit within the two skids. The final design includes two distillation columns, each comprised of five spools. Both columns are rated for 15 psig at 250°F and feature reflux loops to achieve higher ethanol extraction rates. A vacuum pump lowers required energy inputs for distillation within both columns. Special attention was paid to the process flow, to determine equipment placement in the two separate sections.

The first column receives a three-component feed stream. Water and ethanol come off the top of the column while solvent remains as the bottoms product. To conserve energy, solvent leaving the bottom of the column goes through a heat-exchanger loop to preheat the incoming feed. The rejected solvent then is pumped to an off-skid holding tank. Meanwhile, water and ethanol enter the second column where ethanol is recovered as the overhead product. A condenser located on the second skid condenses the ethanol, which goes to an off-skid holding tank.

Piping design was critical. Minimizing overall piping requirements to control project costs was a general goal. The process piping requirements had to be balanced with the piping necessary to connect the process across the two skids. As few connections as possible were desired to reduce potential problems in the handoff between the two skids. The connections between skids were assembled and hydro-tested at EPIC’s fabrication facility before being disconnected temporarily for the journey to the installation site.

SUCCESS
The project was delivered on time and on budget due to the innovative modular design. Following a carefully developed rigging plan, the system was transported and installed successfully at the client site. The overall project timeline was shortened because the skids were built at EPIC’s fabrication facility (Figure 2) while the large plant-upgrade project continued at the client site.

Installation and startup only took a few days because the “plug-and-play” system was fully tested before shipment. Once onsite in the final operational location, process connections and inter-skid connections were mated together and the system was brought online. The distillation unit is performing as planned, providing 91% ethanol extraction.

The entire project took four and half months from the first inquiry by the client to startup at the facility. Engineering, design and drawings accounted for eight weeks; fabrication and assembly consumed eight weeks; testing at EPIC’s shop took one week; delivery and installation required one week; and an on-site EPIC automation engineer provided training for one week.



ART GOLDMANN, P.E., is a senior project manager and process engineer for EPIC Modular Process Systems, St. Louis, Mo. E-mail him at agoldmann@epicsysinc.com.

More from this perspective...

Title

AMS benefits chemical plant from start to finish

DuPont engineers chose Intelligent Device Manager software from Emerson Process Management to help manage all the data available from their instrumentation.

04/08/2005

Process engineering: Wastewater treatment plant goes the distance

A mobile reverse osmosis (RO) system from USFilter effectively treated water at an abandoned fertilizer plant. This allowed system effluent to be discharged into Tampa Bay without environmental impact.

05/17/2005

Software Drives OEM Toward Efficiency and Energy Savings

ABB designed software for its ACS800 drive so Curtis-Toledo could improve the operation of its rotary-screw compressors. The customized software can control the system pressure, air delivery, oil temperature and duty cycle directly from the drive.

06/23/2005

Summit greases its gears to serve global marketplace

A lubricant manufacturer increases order accuracy and speeds fulfillment by implementing enterprise resource planning software.

08/25/2005

Keep heat-transfer-system repairs uneventful

A good plan is the key to avoiding risks in the maintenance of systems using high-temperature organic fluids.

08/26/2005

Neville Chemical upgrades efficiency and safety

A self-cleaning filter not only allowed one company to add efficiency and safety, it also boosted competitiveness.

01/03/2006

Oil refinery minimizes manual tank measurements

The strategy was to enhance plant profitability, increase throughput capacity, upgrade product yields and improve on-stream reliability. Read here to find out what they accomplished.

02/10/2006

ASM Outperforms Traditional Interface

Forty percent of operators at a world-scale North American ethylene plant site discovered that problems were solved 40% faster using new operator interface.

03/14/2006

BP tackles Texas City failings

British Petroleum's tragic March 2005 explosion has been well-documented through the press. Read here to find out how that tragedy spurred the development of a new program addressing management issues at BP.

04/12/2006

Low flow injection improves scale-up of catalysts

Dow Chemical recently developed a reactive catalyst for use in one of its production facilities. Indications were that this new catalyst could save the company millions of euros once it reached full-scale production. The challenge was transferring the recipe using this new reactive catalyst from the laboratory to the pilot plant and, ultimately, to the production level.

08/07/2006

Sasol plant benefits from reliability improvements

Sasol Solvents reduced operating costs by more than $2 million dollars at it’s plants in Sasolburg, South Africa. The efforts earned the facility the 2005 HART Plant of the Year Award.

09/14/2006

Implementing an operations management system

Things are changing at warp speed. Manufacturing companies are collecting large volumes of data from data systems but improvements are possible only if the data are analyzed and developed into useful business parameters.

09/29/2006

Outsourcing innovation development

A new development method may allow breaking away from the pack as companies continue to employ outsource facilities that offer flexibility and foster innovation.

10/31/2006

pH sensor stands up to tough conditions

Design provides improved reliability in a polymer-precursor batch reactor. Sensors must respond quickly and survive a harsh environment. Poor probe reliability can make the difference between a process that makes money and one that doesn’t.

01/08/2007

The intrinsically safe fieldbus has arrived

Fieldbus has proven its merit in bringing projects online more efficiently, allowing better diagnostics, and control, and reducing maintenance costs and inventories. However, it has been limited in intrinsically safe services. At last, technology has come through once again with a solution. The capacity barrier of FISCO has now been significantly surpassed by a novel split architecture design that has already proven itself in the field.

02/09/2007

Sample pump eliminates emissions

A compact system significantly improves analyzer accuracy. This innovative turnkey solution for analyzer emissions is a solid-state pump with an ultra-sensitive pressure regulator that mixes a compatible gas with the analyzer samples to achieve a constant vent header pressure — even during times of plant upset.

03/20/2007

Flame Modeling Provides Matchless Results

A computer simulation helps solve a refinery combustion problem. Finding ways to limit NOx from fired heaters, especially under stringent environmental regulations, has become a major concern for the petroleum refining industry. Complying with new stricter regulations, a Texas refinery upgraded the burners in one of its large cylindrical furnaces.

04/13/2007

Two bulk conveyors prove better than one

Engineers at EaglePicher Corp. in Quapak, Okla., faced some unique problems in manufacturing high-purity isotopic chemicals and wound up addressing them via a unique solution.

07/11/2007

Chill out about cooling costs

Plastic towers can offer economic and operational advantages, and now come in modular designs suitable for bigger loads. Converting to a plastic cooling tower can yield substantial savings.

08/20/2007

Membrane Boasts Material Benefits

As economical separation of contaminants from natural gas becomes increasingly important, simulation eases the design of innovative module to remove carbon dioxide. Membranes offer potential advantages over other methods.

09/11/2007