Diagram Process Design History: Don't Trip Up on Line Lists

Resolve discrepancies and other problems early.

By Dirk Willard, Contributing Editor

"The test pressure seems too high." It was an honest criticism. We had based our line list on the design pressure of the vessel connected to the drain line and come up with 450 psi, with a testing pressure of 680 psi. However, previous hydrostatic tests of the nearby piping connected to that drain line only had been at 400 psi. Such are the challenges of developing a good line list. So, let's review what to consider when putting together a line list and some of the pitfalls.

The line list should define operating, average and maximum temperature and pressure, design temperature and pressure, pipe specification, special requirements (such as post-weld treatment for caustic and sulfur exposure), and hydrostatic test pressure. Most importantly, it must justify the values selected. A history is useful; to document design history, I make comments in a spreadsheet so they can be viewed later.

The line list should consist of two sections: mechanical and process. The mechanical section often only contains line numbers, connections and tie-points but sometimes includes the pipe specification; if the line list requires mating a 300-psi flange to a 150-psi one, it's mechanical's fault. The process portion covers corrosion, safety and pressure relief.

To develop the line list, you'll need: 1) an approved marked-up piping and instrumentation diagram (I never begin a line list without one!); 2) isometric drawings of normally open connecting pipe; 3) pressure safety valve (PSV) set pressures as well as design pressures for equipment and vessels — these may not agree; 4) field or distributed-control-system readings of average and maximum operating temperature and pressure, preferably over at least two to three years; 5) a process flow diagram (PFD) to define the stream composition and risk should a leak occur; 6) equipment curves, e.g., for pumps; 7) a unit operating manual — this is useful for understanding the unit operation, if the PFD isn't current, which is often the case; and, ideally, 8) a discussion with operations to confirm operating conditions — these frequently get lost in translation between project engineering and operation. If pressure readings are too remote, you may need a hydraulic analysis to estimate the true pressure in a pipe.

List the discrepancies among the collected data. A vessel design pressure may exceed the PSV set pressure. A pipe connected to one on the line list may not match the pressure desirable — usually, the highest pressure is chosen for the design pressure unless it conflicts with normally open connecting pipe. This is an important concept: base line list values on normal conditions, not worst case ones.

Design pressure usually is the vessel design pressure (especially if the pipe connects directly), the deadhead pressure of a pump or compressor, or the PSV set pressure. No hard and fast rules exist. If nothing else is available, refer to the plant standards or add, say, 50 psi to the maximum operating pressure.

Because the design temperature really represents fire conditions where metal softens and withstands less pressure, choose it with care. Normally, opt for the isometric temperatures, not the vessel design temperature. If possible, use the maximum operating temperature plus a safety factor of, say, 50°F. Tracing poses an additional problem. For steam tracing, select the normal saturation temperature of the steam supply. For electric tracing, I have seen 250°F used; constant wattage tracing can have an exposure temperature of 500°F.

Now, let's consider the pressure test. Hydrostatic testing is commonly chosen due to familiarity; some companies set a limit of 100 psig on pneumatic testing for "safety reasons," because of a lack of understanding of dynamics. (See: "Choose the Right Fluid for Your Pressure Test.")

It's good practice to test all utility pipes connected to the process at process pressures. Conduct the test at whichever is higher — the flange rating or the design pressure corrected for temperature — plus a 50% margin. For a design pressure of 300 psig, test pressure = 1.5×Ct×300, where Ct is the temperature correction factor for the pipe material. Here's a useful equation for the design-based test with carbon steel: test pressure = 1.5×(5.293×10-11×T4 – 8.710×10-8×T3 + 4.797×10-5×T2 – 8.656×10-3×T + 1)×design pressure, where T is in °F. The pressure mustn't exceed the flange limit set by the metallurgist — if this is a problem, change the pipe specification and probably the tie-point.

Lastly, most line lists require an inspection specification. For carbon steel, checking 10% of the welds is adequate; X-ray 100% of alloy welds.


dirk.jpgDIRK WILLARD is a Chemical Processing Contributing Editor. You can e-mail him at dwillard@putman.net

More from this perspective...

Title

Don't Push the Envelope

Take a sensible approach to avoid ignition dangers.

05/05/2011

Don't Devalue Isometrics

They sometimes can tell you a lot more than P&IDs

10/19/2011

Don't Zone Out On Area Classifications

Electrical ratings must start with analysis of chemicals present.

04/06/2011

Heat Exchangers -- Keep Out of Hot Water

Some simple steps can ease heat exchanger commissioning.

02/03/2011

Know Your Rights

Intellectual property agreements can pose significant concerns.

03/03/2011

Stop Loops Driving You Round the Bend

Practical pointers trump educators' edicts for real-world process control.

01/12/2011

Savor Construction Sites

But make sure the excitement remains enjoyable.

11/17/2011

Succeed at Process Troubleshooting

Take advantage of five easy techniques to find the root cause of problems.

08/08/2011

Survey the Sources of Electrical Risks

A walk-down helps determine the need for purged electrical boxes.

06/14/2011

Work On Workarounds

Treat them as problems that can compromise plant safety.

08/31/2011

Don't Add Pressure to Relief Valve Surveys

Consider the time and cost necessary to do a proper analysis.

04/18/2012

Look at the Big Picture

Ensure that dealing with a safety problem doesn't cause a second risk.

03/22/2012

Make Your Drawings Match Your Process

Outdated P&IDs can lead to tragedy

12/21/2011

Properly Tackle Fluid Flow Problems

This requires far more than modeling software.

02/22/2012

Test the Mettle of FRP Tanks

Commissioning and operating such vessels demands special care.

05/09/2012

Watch Out for Cross-Contamination

Commissioning can pose risks unless you plan carefully.

01/26/2012

Ease Packed-Column Commissioning

A few steps can avoid problems when starting up a tower filled with random packing.

12/27/2012

Operational Safety and Maintenance: Fear Ad Hoc Fixes

Interim solutions can lead to dire consequences.

01/21/2013

Protect Pumps and the Bottom Line

Setting an appropriate minimum flow avoids damage and excessive operating costs

02/06/2013

Consider the Consequences of Chemistry

Reactions can cause a wide variety of non-process problems.

03/06/2013