Perspectives: Field Notes

Don’t Flub Front-End Loading

Ignoring the early phases of front-end loading can imperil project success

By Dirk Willard, Contributing Editor

An operating company asked an engineering firm to develop a thermal oxidizer/scrubber system with triple redundancy. The firm reported back that the system would cost about $30 million. “That’s way too expensive,” the company responded. Finally, after three attempts, the company thanked the firm for its time, paid for the design, and said it had $10 million in mind. Now, here’s a company sorely in need of better front-end loading (FEL). This project was probably dead on arrival, or should have been in FEL-1 or, perhaps, FEL-0. Let’s talk about FEL-0. (By the way, an executive at the company told me there’s no such thing as FEL-0.)

Read more

More from this perspective...

Title

Succeed at Process Troubleshooting

Take advantage of five easy techniques to find the root cause of problems.

08/08/2011

Survey the Sources of Electrical Risks

A walk-down helps determine the need for purged electrical boxes.

06/14/2011

Don't Push the Envelope

Take a sensible approach to avoid ignition dangers.

05/05/2011

Don't Zone Out On Area Classifications

Electrical ratings must start with analysis of chemicals present.

04/06/2011

Know Your Rights

Intellectual property agreements can pose significant concerns.

03/03/2011

Heat Exchangers -- Keep Out of Hot Water

Some simple steps can ease heat exchanger commissioning.

02/03/2011

Stop Loops Driving You Round the Bend

Practical pointers trump educators' edicts for real-world process control.

01/12/2011

Do Your Level Best

Level control with dP transmitters appears simple but really isn't.

11/29/2010

Weak Oversight Can Doom a Project

Don't timidly accept whatever a contractor proposes.

11/02/2010

Keep Confined Space Work Safe

Rigorous attention to detail is essential to minimize risks and enhance response.

09/27/2010

Avoid Surprises During Pump Startup

A well-thought-out approach can eliminate potential problems.

08/26/2010

Watch Out When Job Hunting

Some simple steps can avoid risks and pitfalls.

07/29/2010

Size Pumps Like a Pro

Use a step-by-step process to avoid pitfalls.

07/01/2010

Use Ergonomics To Improve Safety

During design always consider ease of construction and use.

06/03/2010

Expand Your Plant Not Your Problems

Careful project planning and good communications with vendors can avoid hassles.

05/10/2010

Treat Rules of Thumb Right When Measuring

These rules can save time but require a strong dose of skepticism.

04/01/2010

Take the Write Steps for Career Advancement

The ability to compose clear and effective documents is an important asset.

03/03/2010

Avoid a Bad Turn

Centrifugal pump selection demands attention to details.

02/05/2010

Learn Office Politics

Improving your political savvy can help you survive.

01/07/2010

Safety Statistics Can Get You into a Scrape

Focusing on minor accidents can foster false perceptions.

12/03/2009