Perspectives: Field Notes

Don’t Flub Front-End Loading

Ignoring the early phases of front-end loading can imperil project success

By Dirk Willard, Contributing Editor

An operating company asked an engineering firm to develop a thermal oxidizer/scrubber system with triple redundancy. The firm reported back that the system would cost about $30 million. “That’s way too expensive,” the company responded. Finally, after three attempts, the company thanked the firm for its time, paid for the design, and said it had $10 million in mind. Now, here’s a company sorely in need of better front-end loading (FEL). This project was probably dead on arrival, or should have been in FEL-1 or, perhaps, FEL-0. Let’s talk about FEL-0. (By the way, an executive at the company told me there’s no such thing as FEL-0.)

Read more

More from this perspective...

Title

Reduce Your Energy Needs

Achieving savings may provide a powerful career boost.

03/10/2009

Don't Let Design Errors Doom Your Project

Engineering quality assurance demands more attention than it usually gets.

04/16/2009

Don't Dismiss Process Flow Diagrams

Understand the role these diagrams can play and how to use them effectively.

05/14/2009

Take the Right Approach to Projects

Remember the real fun begins after approval.

06/12/2009

Please Don’t Hire Me!

Some contracts simply aren’t worth winning.

07/06/2009

Abandon-in-Place Must End

Leaving equipment derelict instead of demolishing it can prove costly.

08/03/2009

Field Notes: Strive for a Surveyor’s Eye

Surveying and drafting skills can pay off for process people.

09/02/2009

Don’t Gamble With LOTO

Develop a common-sense plan for lockout/tagout.

10/12/2009

Properly Estimate Engineering Hours

Don’t come up short on a project.

11/06/2009

Safety Statistics Can Get You into a Scrape

Focusing on minor accidents can foster false perceptions.

12/03/2009

Learn Office Politics

Improving your political savvy can help you survive.

01/07/2010

Avoid a Bad Turn

Centrifugal pump selection demands attention to details.

02/05/2010

Take the Write Steps for Career Advancement

The ability to compose clear and effective documents is an important asset.

03/03/2010

Treat Rules of Thumb Right When Measuring

These rules can save time but require a strong dose of skepticism.

04/01/2010

Expand Your Plant Not Your Problems

Careful project planning and good communications with vendors can avoid hassles.

05/10/2010

Use Ergonomics To Improve Safety

During design always consider ease of construction and use.

06/03/2010

Size Pumps Like a Pro

Use a step-by-step process to avoid pitfalls.

07/01/2010

Watch Out When Job Hunting

Some simple steps can avoid risks and pitfalls.

07/29/2010

Avoid Surprises During Pump Startup

A well-thought-out approach can eliminate potential problems.

08/26/2010

Keep Confined Space Work Safe

Rigorous attention to detail is essential to minimize risks and enhance response.

09/27/2010