Perspectives: Field Notes

Don’t Flub Front-End Loading

Ignoring the early phases of front-end loading can imperil project success

By Dirk Willard, Contributing Editor

An operating company asked an engineering firm to develop a thermal oxidizer/scrubber system with triple redundancy. The firm reported back that the system would cost about $30 million. “That’s way too expensive,” the company responded. Finally, after three attempts, the company thanked the firm for its time, paid for the design, and said it had $10 million in mind. Now, here’s a company sorely in need of better front-end loading (FEL). This project was probably dead on arrival, or should have been in FEL-1 or, perhaps, FEL-0. Let’s talk about FEL-0. (By the way, an executive at the company told me there’s no such thing as FEL-0.)

Read more

More from this perspective...

Title

Rely on an Ombudsman for a Smoother Project

Working with someone who speaks the operator’s language will avoid problems, according to Dirk Willard, in this month's Field Notes column.

02/12/2007

Remember the old reliable orifice plate

The cost-effective dP flow meter is ideal for utility surveys, Senior Editor Dirk Willard says in this month's Chemical Processing Field Notes column.

09/11/2006

Rest Easy With a Good BEDD

A basic engineering data document establishes ground rules.

02/20/2014

Safety Statistics Can Get You into a Scrape

Focusing on minor accidents can foster false perceptions.

12/03/2009

Safety: Douse a Burning Issue

You're not as safe as some fire safety tests may lead you to believe.

10/22/2013

Savor Construction Sites

But make sure the excitement remains enjoyable.

11/17/2011

Sharpen Your Speaking Skills

Oral presentations say a lot about you.

09/05/2012

Silence Kills

Foster an atmosphere where workers speak up about concerns.

09/26/2011

Size Pumps Like a Pro

Use a step-by-step process to avoid pitfalls.

07/01/2010

Solve the real problem

Sometimes solving a problem causes more harm than good

08/27/2008

Solve the real problem

Sometimes solving a problem causes more harm than good.

05/06/2006

Stick to the basics

Getting immersed in details can doom a basic design contract to financial failure.

02/13/2008

Stop Loops Driving You Round the Bend

Practical pointers trump educators' edicts for real-world process control.

01/12/2011

Strike the Right Balance

Make the walk-through your first line of defense, advises Dirk Willard in this month's Field Notes column.

04/30/2007

Succeed at Process Troubleshooting

Take advantage of five easy techniques to find the root cause of problems.

08/08/2011

Survey the Sources of Electrical Risks

A walk-down helps determine the need for purged electrical boxes.

06/14/2011

Take a studied approach to plant studies

Carefully address the challenges of managing and directing specialized teams

03/13/2008

Take the Right Approach to Projects

Remember the real fun begins after approval.

06/12/2009

Take the Write Steps for Career Advancement

The ability to compose clear and effective documents is an important asset.

03/03/2010

Test the Mettle of FRP Tanks

Commissioning and operating such vessels demands special care.

05/09/2012