Perspectives: Field Notes

Don’t Flub Front-End Loading

Ignoring the early phases of front-end loading can imperil project success

By Dirk Willard, Contributing Editor

An operating company asked an engineering firm to develop a thermal oxidizer/scrubber system with triple redundancy. The firm reported back that the system would cost about $30 million. “That’s way too expensive,” the company responded. Finally, after three attempts, the company thanked the firm for its time, paid for the design, and said it had $10 million in mind. Now, here’s a company sorely in need of better front-end loading (FEL). This project was probably dead on arrival, or should have been in FEL-1 or, perhaps, FEL-0. Let’s talk about FEL-0. (By the way, an executive at the company told me there’s no such thing as FEL-0.)

Read more

More from this perspective...

Title

Contracts Don't Come In On Their Own

Your ability to sell may save you and your company.

08/02/2012

Sharpen Your Speaking Skills

Oral presentations say a lot about you.

09/05/2012

Process modeling: Find the Right Balance

Eight simple rules can help ensure valid material balances.

10/15/2012

Don't Blame Regulations

Environmental and safety mandates don't harm U.S. economic growth.

11/05/2012

Avoid Problems with Random Packing

Careful internals' selection is crucial for absorbers and scrubbers.

11/28/2012

Ease Packed-Column Commissioning

A few steps can avoid problems when starting up a tower filled with random packing.

12/27/2012

Operational Safety and Maintenance: Fear Ad Hoc Fixes

Interim solutions can lead to dire consequences.

01/21/2013

Protect Pumps and the Bottom Line

Setting an appropriate minimum flow avoids damage and excessive operating costs

02/06/2013

Consider the Consequences of Chemistry

Reactions can cause a wide variety of non-process problems.

03/06/2013

Keep Current on Your Electrical Measurement Equipment

Electrical measurements often can offer valuable insights.

04/04/2013

Diagram Process Design History: Don't Trip Up on Line Lists

Resolve discrepancies and other problems early.

05/06/2013

Move Against Static Electricity

Discharges pose persistent perils at plants.

06/06/2013

Avoid Job Hunting Pitfalls

Heed a few tips to forestall frustrations.

07/08/2013

Defuse Dust Dangers

Carefully consider and then counter risks of fire and explosion

08/27/2013

Field Notes: Gun For Better Troubleshooting

Surface temperature measurements often can provide valuable insights.

09/11/2013

Safety: Douse a Burning Issue

You're not as safe as some fire safety tests may lead you to believe.

10/22/2013

Avoid Project Management Mistakes

A number of common mistakes can sabotage success

11/20/2013

Make the Most of Electric Tracing

The technique offers benefits but demands attention to details

01/02/2014

Match the Flow Meter to the Service

Consider operating conditions not just specifications and price

01/23/2014

Rest Easy With a Good BEDD

A basic engineering data document establishes ground rules.

02/20/2014