Articles
| Title/Author | Date |
|---|---|
|
Try process-control and equipment changes to eliminate hydrogen losses. |
12/13/2010 |
|
Weak Oversight Can Doom a Project Don't timidly accept whatever a contractor proposes. |
11/02/2010 |
|
Consider Dynamic Simulation for Steam System Design Models can provide crucial insights for dealing with upsets and transient conditions. |
10/05/2010 |
|
Don't Err With Air-Fin Exchangers Take considerable care when specifying maximum air temperature. |
10/04/2010 |
|
Alleviate Heat Exchanger Flaws Heat exchanger flaws and fouling increase fuel usage and maintenance costs and put operations and production at risk. |
09/29/2010 |
|
Consider Discrete Event Simulation The technique can provide supply chain and process improvement insights. |
09/22/2010 |
|
Check simulator results against calculations using actual data. |
08/16/2010 |
|
Train Your Operators on Energy Efficiency Provide them with the right information and listen to their ideas. |
08/09/2010 |
|
Eastman Chemical Excels In Diverse Markets Company employs innovation and collaboration to serve its customers. |
07/21/2010 |
|
Rethink Reactor Temperature Control Cascade strategy offers simplicity and fast response. |
07/13/2010 |
|
Use Ergonomics To Improve Safety During design always consider ease of construction and use. |
06/03/2010 |
|
Understand the New Motor Standards Regulations will require higher energy efficiency for many AC motors. |
05/27/2010 |
|
Try optimization to help reduce motor energy expenses. |
05/11/2010 |
|
Process Puzzler: Keep Incineration Safe Readers suggest how to deal with a cyanide-containing fuel. |
01/25/2010 |
|
Profit More from Process Simulation The technology can improve a plant's bottom line in numerous ways. |
07/24/2009 |
|
Polymer Plant Achieves Record Output Faster batch turnarounds and better repeatability spur impressive results. |
07/09/2009 |
|
Such process-side control of tubular exchangers offers advantages. |
05/28/2009 |
|
Joining our online community will grant you access to exclusive features |
05/22/2009 |
|
Don't Let Design Errors Doom Your Project Engineering quality assurance demands more attention than it usually gets. |
04/16/2009 |
|
CP 50 company navigates the economy and gives students much-needed experience. |
02/16/2009 |


